Powerware 9335 operation manual Battery Cabinet Installation, Initial Startup

Models: 9335

1 100
Download 100 pages 43.22 Kb
Page 23
Image 23

2.Remove Customer Interface conduit landing plate from the UPS cabinet. Drill or punch conduit holes for interface wiring.

3.Open UPS cabinet front door and remove the front safety shield panel to gain access to the wire way to bring wires from the conduit landing panel at the bottom rear of the cabinet.

4.Locate required connection points by referring to Figure A–1 in Appendix A.

5.Refer to Appendix A of this manual for wiring and termination requirements.

6.Reinstall Customer Interface conduit landing plate.

7.Install conduit and wiring.

8.When wiring is complete, secure UPS by reinstalling all panels removed in previous steps.

2.3Battery Cabinet Installation

The Powerware 9335 has no batteries within the UPS cabinet. An external battery cabinet with appropriate batteries installed is required for proper system operation.

See installation instruction provided with the battery cabinet for proper installation of that portion of the system.

WARNING:

It is very important to ensure that a proper protective device is installed between the battery system and the UPS DC input terminals. See Tables A and B in Appendix A for proper wire and protective device sizing.

2.4Initial Startup

Startup and operational checks should be performed only by authorized service personnel. Contact service in advance (usually a two week notice is required) to reserve a preferred startup date.

2.5Completing the Installation Checklist

The final step in installing your UPS system is completing the following Installation Checklist. This checklist ensures that you have completely installed all hardware, cables, and other equipment. Completing all items listed on the checklist will ensure a smooth installation. You should make a copy of the Installation Checklist before filling it out, and retain the original.

After your installation is complete, a service representative will be able to verify the operation of your UPS system and commission it to support your critical load. The service representative cannot perform any installation tasks other than verifying software and operating setup parameters. Service personnel may request a copy of the

Powerware 9335 (80 kVA and 120 kVA) Installation and Operation

2-5

164201396 REV A 071103

 

Page 23
Image 23
Powerware 9335 operation manual Battery Cabinet Installation, Initial Startup, Completing the Installation Checklist