Chapter 8: Troubleshooting

 

 

 

 

 

 

 

 

 

 

Event

Action

 

 

 

 

 

 

RAID Level migration is

Migration paused because of user intervention,

 

 

paused

schedule or a higher priority background activity.

 

 

 

 

 

 

RAID Level migration is

Migration has resumed again after a pause.

 

 

resumed

 

 

 

 

 

 

 

RAID Level migration is

Migration stopped because of user intervention,

 

 

stopped

schedule or the logical drive was deleted or went

 

 

 

critical or offline.

 

 

 

 

 

 

RAID Level migration has

Bad block found on a disk drive. Migration will finish.

 

 

encountered a physical

Check the disk drive check table after migration and

 

 

disk error

replace disk drive as needed. See page 110.

 

 

 

 

 

 

RAID Level migration is

System resources are low. Reduce system load or

 

 

aborted due to an internal

restart the VTrak. See page 169.

 

 

error.

 

 

 

 

 

 

 

RAID Level migration is

Migration has been set manually or by schedule.

 

 

queued

 

 

 

 

 

 

 

Migration has detected/

Watermarks are progress markers left as the result of

 

 

cleared stale NV

interrupted RAID migrations. If the watermark was

 

 

Watermark

cleared, migration should finish.

 

 

 

 

 

 

Array was incomplete due

RAID migration was interrupted by a shutdown. If

 

 

to missing NV Watermark

array is online, try migration again. See page 100. If

 

 

 

array is offline, delete and recreate array. See

 

 

 

page 95 and page 94.

 

 

 

 

 

 

Rebuild

 

 

 

 

 

 

 

Rebuild is started

Result of settings or user action. Normal.

 

 

 

 

 

 

Rebuild is completed

Normal.

 

 

 

 

 

 

Rebuild is paused

Rebuild paused because of user intervention,

 

 

 

schedule or a higher priority background activity.

 

 

 

 

 

 

Rebuild is resumed

Rebuild has resumed again after a pause.

 

 

 

 

 

 

Rebuild is stopped

Rebuild stopped because of user intervention,

 

 

 

schedule or the logical drive was deleted or the target

 

 

 

disk drive encountered an error. If rebuild stopped by

 

 

 

user intervention, restart the rebuild. See page 101.

 

 

 

 

 

 

Rebuild stopped internally

The logical drive is offline. See page 228.

 

 

 

 

 

 

Rebuild is aborted due to

System resources are low. Reduce system load or

 

 

an internal error.

restart the VTrak. See page 169.

 

 

 

 

 

 

Rebuild is queued

Rebuild has been set manually or by schedule.

 

 

 

 

 

223

Page 231
Image 231
Promise Technology m210p, m310p, VTrak external disk array subsystem manual Rebuild

m210p, VTrak external disk array subsystem, m310p specifications

Promise Technology has established itself as a strong player in the storage solutions market, particularly with its VTrak series of storage systems. Among the notable products in this lineup are the VTrak M310P and M210P models, designed to deliver efficiency, scalability, and high performance for businesses of all sizes.

The Promise VTrak M310P is a high-performance storage solution that emphasizes speed and versatility. This model supports both SAS and SATA drives, enabling enterprises to tailor their storage needs based on workload requirements. It is built with an advanced RAID engine that provides multiple RAID levels, including RAID 0, 1, 5, 6, 10, 50, and 60, ensuring data redundancy and protection against drive failures. The M310P can accommodate up to 96TB of raw storage when fully populated, catering to environments that require large amounts of data retention and quick access times.

Key features of the VTrak M310P include the intuitive management interface, which simplifies storage provisioning and monitoring. This model also incorporates Promise's innovative "HyperRAID" technology, which enhances performance by optimizing I/O operations and providing real-time analytics and reporting. Additionally, the M310P supports a variety of host connection interfaces, including iSCSI, Fibre Channel, and InfiniBand, allowing seamless integration into existing infrastructure.

On the other hand, the VTrak M210P is tailored for a slightly different audience, focusing on small to medium-sized businesses that require reliable and cost-effective storage solutions. The M210P retains several high-end features found in its bigger counterpart while offering a more budget-friendly option. This model also supports a mix of SAS and SATA drives and includes RAID capabilities similar to the M310P for data protection.

The M210P provides a robust set of management tools designed for ease of use, including automated alerts and comprehensive reporting capabilities. Its compact design and reliable performance make it ideal for remote office locations or data centers where space is a premium. Furthermore, the model incorporates advanced power management features to reduce energy consumption without compromising performance.

Both the M310P and M210P are built with scalability in mind, allowing businesses to easily expand their storage capacity as data needs grow. With a focus on durability, performance, and advanced technology, Promise Technology’s VTrak systems are well-positioned to meet the evolving demands of modern data storage. Whether for large enterprises or smaller organizations, these products offer solutions that enhance productivity and ensure data integrity.