Regency F37-NG, F37-LPG Residential And Manufactured Homes, Mobile Homes Installations, Diagram

Models: F37-LPG F37-NG

1 28
Download 28 pages 28.01 Kb
Page 10
Image 10
RESIDENTIAL AND MANUFACTURED HOMES /

INSTALLATION

RESIDENTIAL AND MANUFACTURED HOMES /

MOBILE HOMES INSTALLATIONS

You will require the following components with your new Regency® Rear Flued Room Sealed Freestanding Gas Stove. Please review your product to make sure you have everything you need. In the event that you are missing any part, contact your dealer.

Note: These are the minimum pieces required.

Other parts may be required for your particular installation.

Minimum components for a Horizontal Installation:

946-112 Horizontal Termination Kit which includes:

16-5/8" dia. x 18" (168mm dia. x 457mm) Black Pipe

14" dia. x 18" (102mm dia. x 457mm) Aluminum Flue

1Astro Riser Vent Terminal

1Wall Penetration Heat Shield for Heat Sensitive walls (Wall Thimble) (2 pcs)

1Decorative Wall Trim (Black)

1Tube Mill-Pac

 

Screws

Optional Components:

946-204

45o Elbow - 6-5/8" (168mm) Black pipe

 

and 4" (102mm) Aluminum Flue

946-205

Vinyl Siding Shield for Riser Vent

 

Terminal

946-208/P

Flue Guard

940

Square Wall Thimble Cover*

942Wall Penetration Heat Shield*

* Simpson Dura-Vent components

HORIZONTAL INSTALLATIONS

1) Set the unit in its desired location. Check to

determine if wall studs are in the way when

the fl ueing system is attached. If this is the

case, you may want to adjust the location

of the unit.

2) Assemble the desired combination of pipe

and elbow to the appliance adapter with pipe

seams oriented down. Offset the pipe seams

as double seams in one place will cause the

outer pipe to take an oval shape. Kit comes

complete with 18" (457mm) of straight fl ue

- 6-5/8" (168mm) dia. black outer pipe and

4" (102mm) dia. inner fl ue.

c)Snorkel Terminations:

For installations requiring a vertical rise on the exterior of the building,Astro Riser Vent Terminations as shown in Dia. 2 is available. Follow the same installa- tion procedures as used for standard Horizontal Termination.

NEVERinstalltheAstroRiserventupside down.

3) With the pipe attached to the stove, slide

the stove into its correct location, and mark

the wall for a 9-1/2" (241mm) (inside

dimensions) round hole. The center of the

round hole should line up with the centerline

of the horizontal pipe, as shown in diagram

1. Cut and frame the 9-1/2 (241mm) round

hole in the exterior wall where the fl ue will

be terminated. If the wall being penetrated is

constructedofnon-combustiblematerial,i.e.

masonry block or concrete, a 7" (178mm)

diameter hole is acceptable.

Diagram 1

Note:

a)The horizontal run of fl ue should have a 1/4 inch (6mm) rise for every 1 foot (305mm) of run towards the termination. Never allow the fl ue to run downward. This could cause high temperatures and may present the possibility of a fi re.

b)The location of the horizontal fl ue ter- mination on an exterior wall must meet all local and national building codes, and must not be blocked or obstructed. See the diagram in the "External Flue Termination Locations" section.

Diagram 2

*Diagram 2: Local codes or regulations may require different clearances.

10

F37 Regency® Rear Flued Room Sealed Freestanding Gas Heater

Page 10
Image 10
Regency F37-NG, F37-LPG Residential And Manufactured Homes, Mobile Homes Installations, Horizontal Installations, Diagram