Regency FG39-LPG Dv Stove Horizontal Flue Kit, DV STOVE HORIZONTAL FLUE KIT #946-112INSTALLATION

Models: FG39-NG FG39-LPG

1 36
Download 36 pages 8.73 Kb
Page 10
Image 10
DV STOVE HORIZONTAL FLUE KIT

INSTALLATION

DV STOVE HORIZONTAL FLUE KIT

Horizontal Stove Flue Kit (Part # 946-112) includes all the parts needed to install the FG39 Freestanding Gas unit with minimum horizontal and vertical vent dimensions. For installations that require longer vertical and/or horizontal vents use the Dura-Vent system as shown in your manual.

Qty. Description

1) 2 Rigid Pipe Section 1.2m length, 165mm inside diameter

2) 1 Flex Liner, compressed aluminium 2 ply liner, 102mm inside diameter

3) 4 spring spacers

4) 1 90 deg. Elbow

5) 1 Decorative Wall Trim

6) 1 Adapter

7) 1 AstroCap Termination Cap

8) 2 Trim Collar

9) 1 tube of Mill-Pac, high temperature sealant

10)12 Screws, #8 x 1/2" (13mm) Self tapping, Stainless Steel

11) 14 Screws, #8 x 1/2" (13mm) Self tapping, Black

12) 4 Screws #8 x 1-1/2" (38mm) Drill Point, Stainless Steel

Optional:

946-206 Vinyl Siding Standoff for AstroCap

Note:

a ) Liner sections should be continuous without any joints or seams.

b) This is an approved system, therefore components in this system must not be substituted for any other manufactur- er's products.

c) Wall Thimble is required when install- ing through a combustible wall.

DV STOVE HORIZONTAL FLUE KIT (#946-112) INSTALLATION

Review the following sequence of instruc- tions which are typical of most installations. The sequence may vary depending on wall thickness. Refer to flue location and clear- ance dimensions on pages 8 to 9.

1)Set the unit in its desired location. Check to determine if wall studs will be in the way of the fluing system, adjust location until all clearances are met and there are no obstructions.

Note: A 1-1/2"(38mm) clearance around the outer pipe must be main- tained except that only a 1" (25mm) clearance is needed at the termination end.

IMPORTANT:

Do not locate termination hood where excessive snow or ice buildup may oc- cur. Be sure to check flue termination area after snow falls, and clear to pre- vent accidental blockage of fluing sys- tem. When using snow blowers, make sure snow is not directed towards flue termination area.

Minimum Installation Height:

FG39: 59-3/4" ( 1518mm)

2)Assemble a trial fit to determine the ver- tical center-line for the flue termination.

a)Cut a 241mm round hole on both the interior and exterior wall.

b)Attach the 2 ft. (.6m) pipe section to the flue terminal and slide into posi- tion from the exterior. The larger diameter end of the adjustable pipe goes to the flue terminal.

c)Install the 90o elbow onto the adjust- able pipe to determine the vertical centerline of the starter collar on the unit.

Note: if the centerline cannot be met, the adjustable sections will have to be cut.

10

Regency FG39 FireGenie Freestanding Gas Stove

Page 10
Image 10
Regency FG39-LPG Dv Stove Horizontal Flue Kit, DV STOVE HORIZONTAL FLUE KIT #946-112INSTALLATION, Qty. Description