INSTALLATION
d)Cut the 2 ft. (.6m) section of rigid pipe to length. Ensure that the pipe length when cut will seat onto both the start- er collar and the 90o elbow. Crimped section of rigid pipe seats into the 90o elbow. Only cut the un- crimped side of pipe.
Dismantle all pipe sections including flue terminal.
3)Attach the 4" (102mm) dia. flex liner to the flue terminal ensuring that the flex overlaps the collar of the flue terminal by a minimum of
4)Attach the 2 ft. (.6m)pipe section to the flue terminal using
Hint: Apply the sealant (Mill- Pac and/or high temperature sil- icone) to the outer pipe be- fore connecting the inner pipe.
Note: The pipe seam should be facing down.
Note: To make the instal- lation more aes- thetically pleasing, we recommend framing out a square that the cap can be mounted on.
Note: If installing termination on a siding covered wall, a vinyl siding stand- off or furring strips must be used to ensure that the termination is not recessed into the siding. For vinyl siding standoff installation re- fer to the
5)Slide the partially connected pipe and flue terminal assembly through the wall (from the exterior into the interior) and secure the cap to the exterior wall with 4 of the supplied screws (#8 x
Note: The four screws provided for the flue cap should be replaced with appropriate fasteners for stucco, brick, concrete, or other types of sidings.
6)A bead of
siding standoff to prevent water from en- tering and to make a tight seal between the cap and the standoff.
7)Stretch the 4" (102mm) dia. flex liner out fully and get a trial fit of the liner onto the 4" (102mm) dia. starter collar.
8)Cut the 4" (102mm) dia. flex liner to the desired size.
Hint: leave an extra 12" to 16" (305mm to 406mm) of length, this will make the final assembly easier to work with.
9)Secure the 4" (102mm) dia. flex liner to the 4" (102mm) adapter with
10)Slide the Decorative Wall Cover over the pipe sections.
11)Slide the 90o elbow (crimp end up) and the 2 ft. (.6m) pipe section (crimp end up) over the 4" dia. flex liner.
12)Slide the trim collar over the pipe section to cover the joint.
13)Install the spring spacers onto the pipe sections.
14)Secure the 4" (102mm) dia. flex liner with adapter onto the stove collar. Put a bead of
#8 x ½" (13mm) Self Tapping, Stainless Steel
#8 x ½" (13mm) Self Tapping, Black
#8 x 1½" (38mm) Drill Point, Stainless Steel
15)Attach the pipe section onto the starter collar by sealing with
16)Attach the 90o elbow onto the pipe section by sealing with
17)Slide the 2 ft. (.6m) pipe section onto the 90o elbow. The flex may have to be com- pressed back in order for the pipe to prop- erly mate to the elbow. Seal with
18)Install the trim collar over the starter collar and secure with a #8 x 1/2" (13mm) screw (black).
If the pipe needs to be touched up, use only Stove Brite High Temperature Metallic Black Stove Paint.
NOTE: All inner joints must be sealed with
All outer joints may be sealed with high temperature silicone.
Regency FG39 FireGenie Freestanding Gas Stove | 11 |