Regency L900-LP Maintenance, Dc Sparker Replacement, Bracket, Latch Location Latch, Heat Shield

Models: L900-LP L900-NG

1 56
Download 56 pages 54.9 Kb
Page 46
Image 46
DC SPARKER REPLACEMENT

MAINTENANCE

DC SPARKER REPLACEMENT

1)Remove the exterior brick panels.

2)Remove the glass door.

a.Release the 2 door latches on the left and right side at the top of the fi rebox.

4)Lift up and pull out the heat shield slightly to clear the screwheads and then hang it on the top bracket (located directly above the heat shield).

Bracket

8)Remove the battery cover from the DC Sparker Box.

Latch Location

Latch

b.Swingthedooroutfromthetopandrelease the hinges on the left and right side of the door by lifting them up.

Heat

Shield

5)Unplug the power source.

6)Loosen the 2 screws that hold the right side heat shield.

Battery Cover

9)Disconnect all the wires and connectors from the DC sparker.

MAINTENANCE

Hinge

Door

3)Loosen the 2 screws that hold the left side heat shield in place.

Heat

Shield

7)Lift up and pull out the heat shield slightly to clear the head screws and then hang it on the top bracket (located directly above the heat shield).

Bracket

10)Remove the 2 screws that hold the DC sparker.

Heat

 

Shield
11) Replace the DC sparker.

 

12) Reverse steps to re-install.

 

Heat

 

Shield

46

Regency® L900 Direct Vent Gas Fireplace

Page 46
Image 46
Regency L900-LP Maintenance, Dc Sparker Replacement, Bracket, Latch Location Latch, Heat Shield, Battery Cover, Hinge Door