Roberts Gorden BH-200, BH-60, BH-40, BH-150, BH-175, BH-115, BH-100, BH-140, BH-80 Major Components

Models: BH-125 BH-80 BH-200 BH-140 BH-100 BH-115 BH-175 BH-150 BH-40 BH-60

1 70
Download 70 pages 23.9 Kb
Page 17
Image 17
SECTION 5: MAJOR COMPONENTS

 

 

 

 

 

SECTION 5: MAJOR COMPONENTS

SECTION 5: MAJOR COMPONENTS

 

FIGURE 13: Major Component Descriptions

 

 

 

 

 

 

 

 

 

Burner with Tube Gasket

Reflector (Aluminum or

 

 

 

Must be installed with the

Stainless Steel)

 

 

 

flame observation window

Alternate overlap as shown on

 

 

 

facing down.

overview and on Page 17,

 

 

 

 

 

Figure 16. Minimum overlap is

 

 

 

 

 

6'' (16 cm).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Burner Tube

Tube

Supplied in 10' (3 m) lengths.

Hot rolled or heat treated

Burner tube is always the first

aluminized tube supplied in

tube after the burner.

10' (3 m) lengths.

Tube and Reflector Hanger

Coupling Assembly with Lock

 

with Clamp Package

 

Position this hanger no more

 

than 4” (10 cm) away from the

 

burner.

Reflector End Cap

 

Punch out center section to

 

accommodate tube.

Tube and Reflector Hanger

 

Suspend system from these

 

hangers.

 

Reflector Support Strap & Wire Form

Flex Gas Line with

Shut Off Cock

Vent Adapter

Turbulator

Turbulator must be installed in the last standard section of tube. Turbulator is not required on the BH-125/150/175/200. For installation, see Page 21, Step 6.4

11 of 59

Page 17
Image 17
Roberts Gorden BH-200, BH-60, BH-40, BH-150, BH-175, BH-115, BH-100, BH-140, BH-80, BH-125 service manual Major Components