Roberts Gorden BH-100, BH-60 2 Tube Clamp Package Installation, 3 Coupling and Tube Assembly

Models: BH-125 BH-80 BH-200 BH-140 BH-100 BH-115 BH-175 BH-150 BH-40 BH-60

1 70
Download 70 pages 23.9 Kb
Page 25
Image 25
Step 6.2 Tube Clamp Package Installation

SECTION 6: HEATER INSTALLATION

Step 6.2 Tube Clamp Package Installation

 

Tube Clamp

Bolt

 

 

 

Flat

 

 

Washer

 

 

Nut

 

 

(Torque 120 in/lb

 

 

13.56 Nm)

 

Description

Part Number

 

Tube Clamp Package

01318901

 

Tube Clamp

01396801

 

Bolt

97113940

 

Flat Washer

95211600

 

Nut

92113900

 

Step 6.3 Coupling and Tube Assembly

 

Close coupling

Start slide bar/coupling lock

A with tab.

B onto coupling.

 

Tab

 

 

 

Slide Bar/Coupling Lock

 

 

Wide End

 

 

Coupling

Open

3" (8 cm) to

 

 

 

 

4" (10 cm)

 

Closed

 

 

C Insert tubes into coupling.

D Tighten coupling to join tubes.

 

 

Slide Bar/Coupling Lock

 

Orient coupling so that

Coupling

 

the impact block is in the

 

 

2:00 or 10:00 o’clock

 

 

positions.

Tube

 

Tube

 

 

Tube

Description

Part Number

Coupling

01329600

 

 

Slide Bar/Coupling Lock

01329700

 

Tube

91409XXX

19 of 59

Page 25
Image 25
Roberts Gorden BH-100, BH-60, BH-40, BH-150, BH-175, BH-115 2 Tube Clamp Package Installation, 3 Coupling and Tube Assembly