TABLE OF CONTENTS

SECTION 1: Heater Safety

1

8.11 Outside Combustion Air Supply

39

1.1 Manpower Requirements

1

SECTION 9: Gas Piping

41

1.2 Safety Labels and Their Placement

1

SECTION 10: Wiring

43

1.3 California Proposition 65

1

10.1

Line Voltage Thermostat Wiring

43

SECTION 2: Installer Responsibility

4

10.2

Low Voltage Thermostat Wiring

44

2.1

Wall Tag

4

10.3

Internal Wiring

45

2.2

Corrosive Chemicals

4

10.4

Ladder Diagram

46

2.3

National Standards and Applicable Codes

4

10.5

Electrical Connection to the Burner

46

SECTION 3: Clearances to Combustibles

5

SECTION 11: Operation and Maintenance

47

3.1

Required Clearances to Combustibles

5

11.1 Sequence of Operation

47

SECTION 4: National Standards and Applicable Codes ...

10

11.2 To Shut Off Heater

47

4.1

Gas Codes

10

11.3 To Start Heater

47

4.2

Aircraft Hangars

10

11.4 Pre-Season Maintenance and Annual Inspection

47

4.3

Public Garages

10

11.5 Maintenance Checklist

48

4.4

Electrical

10

SECTION 12: Troubleshooting

50

4.5

Venting

10

12.1

Troubleshooting Flow Chart

51

4.6

High Altitude

10

12.2

Manifold Gas Pressure Setting

53

SECTION 5: Major Components

11

SECTION 13: Replacement Parts

54

5.1

Standard Parts List

12

SECTION 14: General Specifications

57

SECTION 6: Heater Installation

14

14.1

Material Specifications

57

6.1

Burner Tube Installation

18

14.2

Heater Specifications

57

6.2

Tube Clamp Package Installation

19

14.3

Suspension Specifications

57

6.3

Coupling and Tube Assembly

19

14.4

Controls Specifications

57

6.4

Turbulator Installation

21

SECTION 15: The ROBERTS GORDON® BLACKHEATTM BH

6.5

Reflector Installation

22

 

Warranty

59

6.6

Burner Installation

24

 

 

 

SECTION 7: Optional Heater Accessories

25

 

 

 

7.1 U-Tube Configuration

25

 

 

 

7.2 Elbow Package Configuration

28

 

 

 

7.3 Reflector Side Extension

31

 

 

 

7.4 Lower Clearance Shield Installation

32

 

 

 

7.5 Two-Foot Decorative Grille Installation

32

 

 

 

7.6 Protective Grille Installation

34

 

 

 

SECTION 8: Venting

35

 

 

 

8.1

Venting

35

 

 

 

8.2

Unvented Operation

36

 

 

 

8.3

Horizontal Venting

36

 

 

 

8.4

Vertical Venting

36

 

 

 

8.5

Unvented Operation Tube Termination

36

 

 

 

8.6

Length Requirements

36

 

 

 

8.7

Horizontal Ventilation 4'' (10 cm) Pipe

36

 

 

 

8.8

Vertical Ventilation 4'' (10 cm) Pipe

37

 

 

 

8.9

Common Side Wall Venting

37

 

 

 

8.10 Common Vertical Venting

38

 

 

 

© 2012 Roberts-Gordon LLC

All rights reserved. No part of this work covered by the copyrights herein may be reproduced or copied in any form or by any means - graphic, electronic, or mechanical, including photocopying, recording, taping or information storage and retrieval systems - without the written permission of Roberts-Gordon LLC.

Printed in U.S.A.

Page 3
Image 3
Roberts Gorden BH-175, BH-60, BH-40, BH-150, BH-115, BH-100, BH-140, BH-200, BH-80, BH-125 service manual Roberts-Gordon LLC