Manuals
/
Roberts Gorden
/
Household Appliance
/
Electric Heater
Roberts Gorden
BH-100, BH-60 2.2 Elbow Installation, 2.3 Reflector Joint Installation, 29 of
Models:
BH-125
BH-80
BH-200
BH-140
BH-100
BH-115
BH-175
BH-150
BH-40
BH-60
1
35
70
70
Download
70 pages
23.9 Kb
32
33
34
35
36
37
38
39
<
>
Troubleshooting
Specifications
Install
Parts list
Safety Labels and Their Placement
Warranty
Maintenance
U-TubeConfiguration
Wiring
Linear Heater Assembly Overview
Page 35
Image 35
SECTION 7: O
PTIONAL
H
EATER
A
CCESSORIES
Step 7.2.2 Elbow Installation
Tube
Coupling
Step 7.2.3 Reflector Joint Installation
Step 7.2.4 Reflector Joint Installation
29 of 59
Page 34
Page 36
Page 35
Image 35
Page 34
Page 36
Contents
If you smell gas
Installation, Operation &
Blackheat BH
BH-115 BH-200
Page
2012 Roberts-GordonLLC
TABLE OF CONTENTS
Page
LIST OF TABLES
TABLE OF FIGURES
Page
1.3 California Proposition
SECTION 1: HEATER SAFETY
1.1 Manpower Requirements
1.2 Safety Labels and Their Placement
Bottom Panel
Gas Connection Label
Top Panel
Logo Label
Part Number
FIGURE 2: Side and Back Panel Label Placement
3 of
Description
Product Damage Hazard
SECTION 2: INSTALLER RESPONSIBILITY
2.1 Wall Tag
2.2 Corrosive Chemicals
Fire Hazard
FIGURE 3: Standard Reflector
FIGURE 6: 45 Tilt Reflector
Page
inches
FIGURE 12: Venting
4.4 Electrical
4.1 Gas Codes
4.2 Aircraft Hangars
4.3 Public Garages
SECTION 5: MAJOR COMPONENTS
12 of
5.1 Standard Parts List
Aluminized
Core Packages
Minimum
Standard
SECTION 6: HEATER INSTALLATION
Typical Suspension Details
FIGURE 14: Critical Hanger Placement
16 of
FIGURE 15: Linear Heater Assembly Overview
FIGURE 16: Linear Heater Layout Overview
17 of
Part Number
Step 6.1 Burner Tube Installation
18 of
Description
Step 6.3 Coupling and Tube Assembly
Step 6.2 Tube Clamp Package Installation
± 2 5 cm
Step 6.3.1 Coupling and Tube Assembly Continued
Step 6.3.2 Coupling and Tube Assembly Continued
21 of
Step 6.4 Turbulator Installation
Turbulator must be installed in the last
not required on the BH-125/150/175/200
Step 6.5 Reflector Installation
23 of
To ensure proper expansion and contraction
reflector supports and U-clipsdepend on the
Part Number
Step 6.6 Burner Installation
24 of
Description
Edges are sharp
SECTION 7: OPTIONAL HEATER ACCESSORIES
7.1 U-TubeConfiguration
Cut/Pinch Hazard
Loose U-bolt
FIGURE 18: U-TubeHeater Assembly Overview
26 of
Tight U-bolt
27 of
FIGURE 19: U-TubeHeater Layout Overview
LEGEND
28 of
FIGURE 20: U-TubeLayout Overview Continued
SECTION 7 OPTIONAL HEATER ACCESSORIES
Step 7.2.2 Elbow Installation
Step 7.2.3 Reflector Joint Installation
Step 7.2.4 Reflector Joint Installation
30 of
Step 7.2.5 Reflector Joint Detail
FIGURE 21: Reflector Joint Detail
31 of
Step 7.3.1 Bracket Installation
Step 7.3.2 Side Reflector Installation
7.3 Reflector Side Extension
Description
Description
Part Number
Lower Clearance Shield Package
Extension
SECTION 7: OPTIONAL HEATER ACCESSORIES
Description
Distance A
Step 7.6.3 Grille Installation
Step 7.6.2 Grille End Cap Installation
SECTION 8: VENTING
8.5 Unvented Operation Tube Termination
8.2 Unvented Operation
8.3 Horizontal Venting
8.4 Vertical Venting
•Heaters must be of the same BTU output
8.8 Vertical Ventilation 4 10 cm Pipe
8.9 Common Side Wall Venting
Requirements
38 of
8.10 Common Vertical Venting
Requirements
•Heaters must be of the same BTU output
8.11.1 Length Requirements
8.11 Outside Combustion Air Supply
40 of
Requirements
Requirements
SECTION 9: GAS PIPING
CORRECT POSITIONS
when attaching gas hose
INCORRECT POSITIONS WRONG INSTALLATION
FIGURE 23: Gas Connection with Flexible Gas Hose
10.1 Line Voltage Thermostat Wiring
DANGER
SECTION 10: WIRING
Disconnect electric before service
44 of
10.2 Low Voltage Thermostat Wiring
45 of
10.3 Internal Wiring
SECTION 10: WIRING
Green to Gnd
Connect wires together with
BX or Romex Connector
Internal Wire Bundle Burner Box
DANGER
SECTION 11: OPERATION AND MAINTENANCE
11.5 Maintenance Checklist
See Page 5, Section
See Page 35, Section
See Page 14, Section
See Page 32, Section
See Page 43, Section
See Page 15, Figure
See Page 32, Section 7.5 and Page 34, Section
DANGER
SECTION 12: TROUBLESHOOTING
51 of
12.1 Troubleshooting Flow Chart
52 of
53 of
12.2 Manifold Gas Pressure Setting
SECTION 12: TROUBLESHOOTING
DANGER
SECTION 13: REPLACEMENT PARTS
55 of
SECTION 13 REPLACEMENT PARTS
Part Number
56 of
Description
SECTION 14: GENERAL SPECIFICATIONS
58 of
LIMITATIONS ON AUTHORITY OF REPRESENTATIVES
WARRANTY IS VOID IF
ROBERTS-GORDONLLC WILL PAY FOR
ROBERTS-GORDONLLC WILL NOT PAY FOR
Page
Page
Page