Roberts Gorden HE-60, HE-80 4.2 Coupling and Tube Assembly Continued, 5 Turbulator Installation

Models: HE-125 HE-150 HE-100 HE-40 HE-175 HE-80 HE-60

1 72
Download 72 pages 53.49 Kb
Page 28
Image 28

HE-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

Step 6.4.2 Coupling and Tube Assembly (Continued)

7' 6" ± 1'

(2.3 m ± .25 m)

10' ± 1'

(3 m ± .25 m)

Total Overall

Tube Length

Step 6.5 Turbulator Installation

 

T

 

w

 

i

Turbulator

s

t

Section

 

TurbulatorTab

Adapter

Turbulator Section (stainless) used in HE-40 heaters must be in the section of tube nearest to the burner.

Model

Tube Length

HE-40

10' (3 m)

 

 

HE-60

20' (6 m)

 

 

HE-80

20' (6 m)

HE-100

30' (9 m)

 

 

HE-125

40' (12 m)

 

 

HE-150

50' (15 m)

HE-175

60' (18 m)

 

 

Hanging hardware shown is for indoor installation only. See Page 17, Figure

15for outdoor suspension details.

Turbulator must be installed in the last standard section of tube. Turbulator is not required on the HE-125/150/175.

Turbulator Installation

Model

Tube Section

HE-40

1st 10' Section

HE-60

2nd 10' Section

HE-80

2nd 10' Section

HE-100

3rd 10' Section

HE-125

N/A

HE-150

N/A

HE-175

N/A

Description

Part Number

Turbulator Adapter

03051503

Turbulator Section

03051504

Turbulator Section (Stainless)

03051505

Tube

91409XXX

Pull String

Fold tab around outside

of tube nearest to the vent to hold turbulator in place.

22

Page 28
Image 28
Roberts Gorden HE-60, HE-80, HE-175, HE-40, HE-100, HE-150 4.2 Coupling and Tube Assembly Continued, 5 Turbulator Installation