Check and Test Operation

Check

Be sure to check the following again after completion of installation.

1.Check the piping connection area for any gas leakage.

Outdoor connection area

Indoor connection area

2. Is the drain hose properly connected?

Drain hose

Indoor and

outdoor unit connection

3. Is the insulation of the piping in good condition?

4. Is grounding properly made?

Insulation

AP50Q1C_IBIM_E 32202-2.indd 31

E-31

2010-07-14 오후 4:42:17

Page 31
Image 31
Samsung AP55Q1CNUMG, AP55Q1DNUMG manual Check and Test Operation