Sanyo DE operation manual For the safety sake, Making the World a More Comfortable Place

Models: DE

1 50
Download 50 pages 27.2 Kb
Page 1
Image 1
Making the World a More Comfortable Place

Making the World a More Comfortable Place

SANYO’s absorption technology is in evidence in many aspects of our daily lives, from where we do business to the places we choose to relax.

 For the safety sake For the safety sake

Before operating the unit

*To use the unit properly before operating, be sure to carefully read the operation manual.

*Installation should conform to regulations and laws such as Building Standard Act, Fire Laws, Air Pollution Prevention Laws and Labor Safety and Sanitary Law, and to any other applicable regulations and laws.

On the installation

*Read the installation manual carefully before carried-in and installing the unit.

*Carried-in and works of installation, foundation, wiring, piping, interlocks and thermal insulation are involved. Please contact your agency with any questions relating to these issues. In case such works are inadequate, it may cause overturn, electric shock, water and fuel leakage, scalding, fire and so forth.

*Please consult your agency when the work of flue, exhaust and in-take air duct, and chimneys are required. In case such works are inadequate, it may cause scalding, fire and oxygen deficiency.

*Waterproof work of the foundation for installing the unit and drainage ditch are required in order to prevent wetting surrounding equipment.

*Adequate space surrounding the unit is needed for maintenance work. Such space is indispensable for safe work and avoiding injuries.

For maintenance

*Periodical maintenance, in addition to daily inspection, is required. If it is improper in maintenance, it may cause fire, electric shock and scalding.

*Please consult the service agency to obtain professional guidance.

Avoiding hazardous places

*Keep the units away from inflammable dangerous substance such as gasoline and thinner and erosive gas which may result in a fire.

ISO 9001

 

ISO 14001

 

JISZ 9901

QS Accreditation

JISQ 14001

EMS Accreditation

 

R004

 

RE011

File No. : JQ116A

 

File No. : JE011A

 

Date : October 13, 1997

Date : November 23, 1998

SANYO Electric Air Conditioning Co.,Ltd.

International Business Division

Overseas Sales & Marketing Dept.

1 Otsuki-Cho, Ashikaga-City, Tochigi 326-8534, Japan Telephone : +81-284-44-3222 Facsimile : +81-284-44-3138 http://kuchosys.sanyo.co.jp/eng/

SANYO Electric Trading Co.,Ltd.

1-10 Ueno 1-chome,Taito-ku, Tokyo 110-8534 Japan

Telephone : +81-3-3837-6266

Facsimile : +81-3-3837-6389

©2000SANYO Printed in Japan ’00 7 IM0.5

Type DE (Direct-fired Chiller/Heaters) Type NE (Steam-fired Chillers)

Type LE (Hot water-fired Chillers)

SAE-2002
Page 1
Image 1
Sanyo DE operation manual For the safety sake, Making the World a More Comfortable Place, Type LE Hot water-firedChillers