ENVIRONMENTALLY FRIENDLY TECHNOLOGY
Insulation (LE)
SUPER ABSORPTION
Rupture disk mounting
Figure 65. Insulation of LE
Generator cover |
| Generator cover |
|
| |
|
|
|
In some instances local codes may dictate the use of a rupture disk to prevent damage to the chiller in the event of overpressurization of the high and low temperature generators. SANYO units are provided with a flange for mounting a rupture disk.
At this flange connection, a rupture disk may be installed and connected to a
It is the responsibility of the installing contractor to install the rupture disk on the units and overflow tank (if required) prior to initial chiller startup.
Figure 66. Piping of rupture disk
Discharge piping
Rupture disk mounting instructions are as follows:
1.Prior to installing or replacing the rupture disk, insure that a slight positive pressure is maintained in the chiller with nitrogen gas.
2.Apply Teflon paste to both sides of gasket.
3.Align gasket as shown in Figure 68.
4.Assemble flanges and torque per specifications shown in the manual of rupture disk.
5.Conduct leak test using nitrogen gas at 49 kPa (0.5 kg/cm2G) after installation of rupture disk.
6.Periodic maintenance should include tightening the rupture disk with a torque wrench.
Evaporator coverEvaporator cover
Don't insulate the motor, refrigerant pump and sight glass.
Evaporator cover and chamber cover are |
| 30mm thick insulation for cold surface |
removable in construction |
| |
|
| |
75mm thick insulation for hot surface |
| 30mm thick insulation for cold surface |
| ||
|
| |
50mm thick insulation for hot surface |
|
|
Table 18. Insulation data
| Hot surface | Cold surface | ||
| insulation(m2) | insulation(m2) | ||
Model | 75mm | 30mm | 50mm | 30mm |
2.3 | 1.4 | 3.3 | 0.2 | |
2.3 | 1.4 | 3.3 | 0.2 | |
2.7 | 1.6 | 3.9 | 0.3 | |
2.8 | 1.6 | 4.0 | 0.3 | |
2.8 | 1.8 | 4.0 | 0.3 |
Rupture disk
Support
Vent piping
Tank
Above 35 QFT
: Scope of supply by SANYO
Drain
3.8 | 1.9 | 5.5 | 0.3 | |
3.8 | 2.2 | 5.5 | 0.3 | |
4.0 | 2.5 | 6.1 | 0.4 | |
4.0 | 2.5 | 6.1 | 0.4 | |
5.2 | 3.1 | 7.6 | 0.5 | |
5.2 | 3.3 | 7.6 | 0.5 | |
6.0 | 3.5 | 8.5 | 0.5 | |
6.0 | 3.6 | 8.5 | 0.5 | |
6.6 | 3.7 | 9.9 | 0.5 | |
6.6 | 3.9 | 9.9 | 0.5 | |
7.6 | 4.8 | 13.8 | 0.7 | |
8.4 | 5.1 | 15.0 | 0.7 |
Figure 67. Fixing methed of rupture disk
High tension bolt
High tension nut
To tank
Pipe |
| Cap screw |
|
|
|
Flange
Teflon paste
Flange
Safety head
Rupture disk
Safety head
9.2 | 5.3 | 16.1 | 0.7 |
Pipe
Gasket
Teflon paste
Notice :
1)Material : Glass wool or rock wool
2)The total area includes the area of pipes in the chiller.
3)The machine is coated with rust preventive paint before shipment, but is not provided with finish paint.
92
From chiller
Figure 68. Gasket
A
• Material :
4.5
3.2
CB
| 4 inch | 6 inch |
|
| disk | disk |
|
|
|
|
|
A | 174.8 | 222.3 |
|
(mm) |
| ||
|
|
| |
|
|
|
|
B | 149.4 | 209.6 |
|
(mm) |
| ||
|
|
| |
|
|
|
|
C | 127.6 | 182.6 |
|
(mm) |
| ||
|
|
| |
|
|
| 93 |
|
|
|