Scope of supply (LE)

ENVIRONMENTALLY FRIENDLY TECHNOLOGY

Scope of supply (LE)

1.Absorption chiller

(1)Lower shell

•Evaporator and refrigerant dispersion tray •Absorber and absorbent dispersion tray •Eliminators

(2)Heat exchangers

(3)Upper shell •Generator •Condenser •Eliminators

(4)Pumps

•Absorbent pump(s) with isolating valves •Refrigerant pump with isolating valves •Purge pump

(5)Control panel

•CE marking (if requested according to the regulation).

(6)Hot water control valve

(7)Locally mounted controls and electric parts •Temperature sensor

(8)Purge unit •Purge tank •Ejector and liquid trap

•Piping and various manual valves •Palladium cell with heater

(9)Interconnecting piping and wiring

(10)Initial charge

•Absorbent (lithium bromide) •Refrigerant

•Inhibitor

(11) Painting

•Main unit: Rust preventive paint

•Control panel: Finish paint

(14) Accessories

•Operation manual : One set

•Washer (for fixing foundation bolts) : One set

•Manometer : One piece

•Gasket and sealant for rupture disk : One set (if requested according to the regulation).

2.Factory test

Tests below are carried out in the SANYO factory. •Check of external dimensions

•Leak test (vacuum side) •Hydraulic test for water headers •Electric insulation resistance test •Dielectric breakdown test

•Function test only for electric circuit and safety devices •Performance test of one section shipping unit.

(one unit is tested when several units of the same model are ordered for one project)

3.Scope of supply of the purchaser

(1)Unloading, transportation, and insurance depend on the individual sales contractor between your company and SANYO group.

(2)Foundations with foundation bolts.

(3)External chilled water, cooling water, and hot water piping work including various safety valves. isolating valves, etc.

(4)Rupture disk, flange of rupture disk, bolts, nuts, piping work and tank, etc, if necessary.

(5)External wiring and piping for the chillers including necessary parts.

(6)Insulation for the chillers including necessary parts.

(7)Mating flanges, gaskets, bolts and nuts

•Inlet/outlet nozzle flanges for chilled water. (evaporator) •Inlet/outlet nozzle flanges for cooling water. (absorber/condenser). •Inlet/outlet nozzle flanges for hot water. (generator)

(8)Finish painting of the chiller.

(9)Cooling water inlet temperature control device.

(10)Furnishing electric wiring/piping of hot water control valve including necessary parts.

(11)Various temp./press. gauges for water lines.

(12)Cooling tower(s), chilled water pump(s) , cooling water pump(s) and hot water pump(s) and it’s auxiliary accessaries.

(13)Electric power supply (specified value).

(14)Supply of chilled water, cooling water and hot water at rated conditions.

(15)Necessary tools, workers and materials for installation and site test operation.

(16)After-sales service and periodical maintenance of the chillers.

(17)Any other item not specifically mentioned in the scope of supply.

SUPER ABSORPTION

Scope of order (LE)

 

Item

 

 

Standard

Option

 

Temperature

Inlet : 13.0° C

 

Outlet : 6° C~12° C

 

Outlet :8.0° C

 

Temperature difference : 3° C~10° C

 

 

 

water

Flow rate

0.605m3/h•RT

 

Changes depending on chilled water temperature

 

difference (min. flow rate : 50%)

Max. working pressure

784kPa (8kg/cm2G)

981~1,961kPa (10 ~ 20kg/cm2G)

Chilled

Fouling factor

0.088m2

° C/kW (0.0001m2h° C/kcal)

0.196m2 ° C/kW (0.0002m2h° C/kcal)

 

Hydraulic test pressure

Max. working press. +196kPa (2kg / cm2)

Max. working press.1.5 times

 

 

 

 

 

 

Material of tube

Copper tube

 

No option

 

Water quality

Refer to JRA-GL02E-1994

No option

 

Structure of water header

Removal type

 

No option

 

Manufacturing standard of water header

SANYO standard

 

No option

 

Temperature

Inlet : 31° C

 

Inlet : 20.0° C~33.0° C

 

Outlet : 37° C

 

 

 

 

 

water

Flow rate

1.215m3/h•RT

 

Within the water flow range of each model

Max. working pressure

784kPa (8kg/cm2G)

981~1,961kPa (10 ~ 20kg/cm2G)

 

Cooling

Hydraulic test pressure

Max. working press. +196kPa (2kg / cm2)

Max. working press.1.5 times

Material of tubes

Copper tube

 

No option

 

Fouling factor

0.088m2

° C/kW (0.0001m2h° C/kcal)

0.196m2 ° C/kW (0.0002m2h° C/kcal)

 

 

 

 

 

Water quality

Refer to JRA-GL02E-1994

No option

 

Structure of water header

Removal type

 

No option

 

Manufacturing standard of water header

SANYO standard

 

No option

 

Temperature

Inlet : 88° C

 

Intel : 80° C~95° C

 

Outlet : 83° C

 

 

 

 

 

water

Flow rate

1.215m3/h•RT

 

Within the water flow range of each model

Max. working pressure

784kPa (8kg/cm2G)

No option

 

Hot

Hydraulic test pressure

1,471kPa (15kg/cm2G)�

No option

Material of tubes

Material : Copper

 

No option

 

Water quality

Refer to JRA-GL02E-1994

No option

 

Structure of water header

Removal type

 

No option

 

Manufacturing standard of water header

Japanese pressure vessel code

No option

 

 

3 phase 380V 50Hz

 

Electricity

(Voltage regulation : within ± 10%)

Contact SANYO's representative

 

 

(Frequency regulation : within ± 5%)

 

Shipment

One-section

 

Multi-shipment

 

 

•Refrigerant temperature supervision

 

 

 

•Chilled water freeze protection

 

 

Safety functions

•Chilled water floe switch

 

Control

•Cooling water temperature supervision

Cooling water flow switch

 

•Generator temperature supervision

 

 

•Crystallization protection

 

 

 

•Motor protection

 

 

 

 

 

 

 

Capacity control

•Digital PID control by chilled water outlet temperature

No option

 

•Inverter control of No.1 absorbent pump

 

 

 

 

Parts

Selected by SANYO

 

 

Painting

Munsell 5Y-7/1

 

No option

 

Indication lamps

•Operation

: red

No option

 

•Stop

 

: green

panel

 

•Equipment alarm : orange

 

Display

•LCD

 

 

No option

Control

(no-voltage normal open contact)

•Alarm indication

 

 

 

 

•Operation indication

 

 

External terminals

•Stop indication

 

No option

 

 

 

 

 

 

 

•Answer back indication

 

 

 

 

 

 

 

Structure

Indoor type

 

No option

 

Parts

Selected by SANYO

No option

Electrical wiring and piping

Wiring : 600V grade polyvinyl chloride-insulated wire

No option

Pipe : plicatube (flexible metal conduit)

No option

 

 

condition

Place

Indoor

 

 

No option

Ambient humidity

Relative humidity : Max. 90% (45° C)

No option

 

Ambient temperature

5° C~40°

C

 

No option

Installation

 

 

 

 

 

 

Be sure the following are not present:

 

 

 

 

 

Atmosphere

•Corrosive gas

 

No option

 

•Explosive gas

 

 

 

 

 

 

 

•Poisonous gas

 

 

66

67

Page 35