Energy & Power Quality Meter
PowerLogic ION8800
Installation Guide 05/2007
Page
Installation Considerations
DANGER
Danger
Standards Compliance
Network Compatibility Notice for the Internal Modem
I/O Options
ION8800 Models
Before You Begin
Available Options
Meter Back
Meter Overview
Meter Front Cover Closed
Meter Front Cover Open
Front Panel Button Functions
Meter Labels
Front of Rack View
Unit Dimensions
Meter dimensions conform to DIN standard Front View of Meter
Side View of Meter
Order Options B/C Circuit & Pinout Diagrams
E D C B
Essailec Connections
E D C B A
Order Option A Circuit & Pinout Diagrams
Description
Order Options A/B/C Essailec Connector Arrangement
Essailec Connector Pin
Meter Port
D C B A
Order Options D/E Circuit & Pinout Diagrams
Order Options D/E Essailec Connector Arrangement
Meter Battery Considerations
Step 1 Mount the Meter
Installation DANGER
Environmental Specifications IEC62052-11
Form A Digital Outputs Solid State Relay Outputs DO5 - DO12
Step 2 Wire the Digital I/O
Form C Digital Output Mechanical Alarm Relay
Form C Digital Output Solid State Relay Outputs DO1 - DO4
Current Inputs Low Current Option
Step 3 Wire the Voltage and Current Inputs
Voltage Inputs
Current Inputs High Current Option
LINE
4-Wire Wye, 3-Element, Direct Connection Diagram
4-Wire Wye, 3-Element, 3 PTs Connection Diagram
4-Wire Wye, 2½-Element, 2 PTs Connection
LINE
3-Wire Solid-Grounded Wye, 3-Element, Direct Connection
3-Wire Delta, 2½-Element, Direct Connection
3-Wire Delta, 2-Element 2 PTs & 2 CTs
Single Phase
3-Wire Delta, 2½-Element, 2 PTs & 3 CTs
Single Phase Connection Diagram
Using Potential Transformers
RS-232 Connections COM3 optional module
Step 4 Wire the Communications
Infrared Connections COM1
RS-485 Connections COM2 and COM3
10Base-T
Ethernet TCP/IP Service Ports
Ethernet Connections optional module
Internal Modem Connection COM4 optional module
Single Phase Power Supply
Step 5 Wire the Power Supply
Step 6 Power Up the Meter
Step 7 Set Up the Meter Using the Front Panel
Specifies the meter’s transmit delay
Setting
Default
The power system’s configuration
Menu
thousands and decimal place holder
Phasor Diagrams
DELTA phasors for UNITY Power Factor resistive load
Step 8 Verify Meter Operation
WYE - 123 Rotation
WYE - 132 Rotation
Active Power +kW
2 Element 3Wire DELTA - 123 Rotation
2 Element 3Wire DELTA - 132 Rotation
Rotation
Step 9 View Meter Data
NORM mode
ALT mode
Max kW delivered for each TOU rate in PB
TEST Mode
To replace the battery
Replacing the Battery
Battery Specifications
Battery Dimensions
Meter Seals
Meter Security
Hardware Locked Security Option
Anti-Tamper Sealing Methods
Sealing Bar Screw with Through-hole Sealing Wire Lead Sealing Tab
2007 Schneider Electric. All rights reserved
Page
2195 Keating Cross Road
Installation Guide
ION8800
Schneider Electric