Energy & Power Quality Meter
PowerLogic ION8800
Installation Guide 05/2007
Page
Installation Considerations
DANGER
Danger
Standards Compliance
Network Compatibility Notice for the Internal Modem
Before You Begin
ION8800 Models
Available Options
I/O Options
Meter Front Cover Closed
Meter Overview
Meter Front Cover Open
Meter Back
Front Panel Button Functions
Meter Labels
Meter dimensions conform to DIN standard Front View of Meter
Unit Dimensions
Side View of Meter
Front of Rack View
Order Options B/C Circuit & Pinout Diagrams
E D C B
Essailec Connections
E D C B A
Order Option A Circuit & Pinout Diagrams
Essailec Connector Pin
Order Options A/B/C Essailec Connector Arrangement
Meter Port
Description
D C B A
Order Options D/E Circuit & Pinout Diagrams
Order Options D/E Essailec Connector Arrangement
Meter Battery Considerations
Step 1 Mount the Meter
Installation DANGER
Environmental Specifications IEC62052-11
Form C Digital Output Mechanical Alarm Relay
Step 2 Wire the Digital I/O
Form C Digital Output Solid State Relay Outputs DO1 - DO4
Form A Digital Outputs Solid State Relay Outputs DO5 - DO12
Voltage Inputs
Step 3 Wire the Voltage and Current Inputs
Current Inputs High Current Option
Current Inputs Low Current Option
4-Wire Wye, 3-Element, 3 PTs Connection Diagram
4-Wire Wye, 3-Element, Direct Connection Diagram
4-Wire Wye, 2½-Element, 2 PTs Connection
LINE
3-Wire Delta, 2½-Element, Direct Connection
3-Wire Solid-Grounded Wye, 3-Element, Direct Connection
3-Wire Delta, 2-Element 2 PTs & 2 CTs
LINE
Single Phase Connection Diagram
3-Wire Delta, 2½-Element, 2 PTs & 3 CTs
Using Potential Transformers
Single Phase
Infrared Connections COM1
Step 4 Wire the Communications
RS-485 Connections COM2 and COM3
RS-232 Connections COM3 optional module
Ethernet Connections optional module
Ethernet TCP/IP Service Ports
Internal Modem Connection COM4 optional module
10Base-T
Step 6 Power Up the Meter
Step 5 Wire the Power Supply
Step 7 Set Up the Meter Using the Front Panel
Single Phase Power Supply
Default
Setting
The power system’s configuration
Specifies the meter’s transmit delay
Menu
thousands and decimal place holder
Phasor Diagrams
DELTA phasors for UNITY Power Factor resistive load
Step 8 Verify Meter Operation
WYE - 123 Rotation
WYE - 132 Rotation
Active Power +kW
2 Element 3Wire DELTA - 123 Rotation
2 Element 3Wire DELTA - 132 Rotation
Rotation
Step 9 View Meter Data
NORM mode
ALT mode
Max kW delivered for each TOU rate in PB
TEST Mode
Battery Specifications
Replacing the Battery
Battery Dimensions
To replace the battery
Hardware Locked Security Option
Meter Security
Anti-Tamper Sealing Methods
Meter Seals
Sealing Bar Screw with Through-hole Sealing Wire Lead Sealing Tab
2007 Schneider Electric. All rights reserved
Page
ION8800
Installation Guide
Schneider Electric
2195 Keating Cross Road