PowerLogic ION8800
Energy & Power Quality Meter
Installation Guide 05/2007
Page
DANGER
Installation Considerations
Danger
Network Compatibility Notice for the Internal Modem
Standards Compliance
ION8800 Models
Before You Begin
Available Options
I/O Options
Meter Overview
Meter Front Cover Closed
Meter Front Cover Open
Meter Back
Meter Labels
Front Panel Button Functions
Unit Dimensions
Meter dimensions conform to DIN standard Front View of Meter
Side View of Meter
Front of Rack View
E D C B
Order Options B/C Circuit & Pinout Diagrams
Essailec Connections
Order Option A Circuit & Pinout Diagrams
E D C B A
Order Options A/B/C Essailec Connector Arrangement
Essailec Connector Pin
Meter Port
Description
Order Options D/E Circuit & Pinout Diagrams
D C B A
Meter Battery Considerations
Order Options D/E Essailec Connector Arrangement
Step 1 Mount the Meter
Environmental Specifications IEC62052-11
Installation DANGER
Step 2 Wire the Digital I/O
Form C Digital Output Mechanical Alarm Relay
Form C Digital Output Solid State Relay Outputs DO1 - DO4
Form A Digital Outputs Solid State Relay Outputs DO5 - DO12
Step 3 Wire the Voltage and Current Inputs
Voltage Inputs
Current Inputs High Current Option
Current Inputs Low Current Option
4-Wire Wye, 3-Element, Direct Connection Diagram
4-Wire Wye, 3-Element, 3 PTs Connection Diagram
4-Wire Wye, 2½-Element, 2 PTs Connection
LINE
3-Wire Solid-Grounded Wye, 3-Element, Direct Connection
3-Wire Delta, 2½-Element, Direct Connection
3-Wire Delta, 2-Element 2 PTs & 2 CTs
LINE
3-Wire Delta, 2½-Element, 2 PTs & 3 CTs
Single Phase Connection Diagram
Using Potential Transformers
Single Phase
Step 4 Wire the Communications
Infrared Connections COM1
RS-485 Connections COM2 and COM3
RS-232 Connections COM3 optional module
Ethernet TCP/IP Service Ports
Ethernet Connections optional module
Internal Modem Connection COM4 optional module
10Base-T
Step 5 Wire the Power Supply
Step 6 Power Up the Meter
Step 7 Set Up the Meter Using the Front Panel
Single Phase Power Supply
Setting
Default
The power system’s configuration
Specifies the meter’s transmit delay
Menu
thousands and decimal place holder
DELTA phasors for UNITY Power Factor resistive load
Phasor Diagrams
Step 8 Verify Meter Operation
WYE - 132 Rotation
WYE - 123 Rotation
Active Power +kW
2 Element 3Wire DELTA - 132 Rotation
2 Element 3Wire DELTA - 123 Rotation
Rotation
NORM mode
Step 9 View Meter Data
ALT mode
TEST Mode
Max kW delivered for each TOU rate in PB
Replacing the Battery
Battery Specifications
Battery Dimensions
To replace the battery
Meter Security
Hardware Locked Security Option
Anti-Tamper Sealing Methods
Meter Seals
Sealing Bar Screw with Through-hole Sealing Wire Lead Sealing Tab
2007 Schneider Electric. All rights reserved
Page
Installation Guide
ION8800
Schneider Electric
2195 Keating Cross Road