PowerLogic ION8800
Energy & Power Quality Meter
Installation Guide 05/2007
Page
DANGER
Installation Considerations
Danger
Network Compatibility Notice for the Internal Modem
Standards Compliance
Available Options
ION8800 Models
Before You Begin
I/O Options
Meter Front Cover Open
Meter Overview
Meter Front Cover Closed
Meter Back
Meter Labels
Front Panel Button Functions
Side View of Meter
Unit Dimensions
Meter dimensions conform to DIN standard Front View of Meter
Front of Rack View
E D C B
Order Options B/C Circuit & Pinout Diagrams
Essailec Connections
Order Option A Circuit & Pinout Diagrams
E D C B A
Meter Port
Order Options A/B/C Essailec Connector Arrangement
Essailec Connector Pin
Description
Order Options D/E Circuit & Pinout Diagrams
D C B A
Meter Battery Considerations
Order Options D/E Essailec Connector Arrangement
Step 1 Mount the Meter
Environmental Specifications IEC62052-11
Installation DANGER
Form C Digital Output Solid State Relay Outputs DO1 - DO4
Step 2 Wire the Digital I/O
Form C Digital Output Mechanical Alarm Relay
Form A Digital Outputs Solid State Relay Outputs DO5 - DO12
Current Inputs High Current Option
Step 3 Wire the Voltage and Current Inputs
Voltage Inputs
Current Inputs Low Current Option
4-Wire Wye, 2½-Element, 2 PTs Connection
4-Wire Wye, 3-Element, Direct Connection Diagram
4-Wire Wye, 3-Element, 3 PTs Connection Diagram
LINE
3-Wire Delta, 2-Element 2 PTs & 2 CTs
3-Wire Solid-Grounded Wye, 3-Element, Direct Connection
3-Wire Delta, 2½-Element, Direct Connection
LINE
Using Potential Transformers
3-Wire Delta, 2½-Element, 2 PTs & 3 CTs
Single Phase Connection Diagram
Single Phase
RS-485 Connections COM2 and COM3
Step 4 Wire the Communications
Infrared Connections COM1
RS-232 Connections COM3 optional module
Internal Modem Connection COM4 optional module
Ethernet TCP/IP Service Ports
Ethernet Connections optional module
10Base-T
Step 7 Set Up the Meter Using the Front Panel
Step 5 Wire the Power Supply
Step 6 Power Up the Meter
Single Phase Power Supply
The power system’s configuration
Setting
Default
Specifies the meter’s transmit delay
Menu
thousands and decimal place holder
DELTA phasors for UNITY Power Factor resistive load
Phasor Diagrams
Step 8 Verify Meter Operation
WYE - 132 Rotation
WYE - 123 Rotation
Active Power +kW
2 Element 3Wire DELTA - 132 Rotation
2 Element 3Wire DELTA - 123 Rotation
Rotation
NORM mode
Step 9 View Meter Data
ALT mode
TEST Mode
Max kW delivered for each TOU rate in PB
Battery Dimensions
Replacing the Battery
Battery Specifications
To replace the battery
Anti-Tamper Sealing Methods
Meter Security
Hardware Locked Security Option
Meter Seals
Sealing Bar Screw with Through-hole Sealing Wire Lead Sealing Tab
2007 Schneider Electric. All rights reserved
Page
Schneider Electric
Installation Guide
ION8800
2195 Keating Cross Road