C1448, C1848, C2148W
Air and Water Cooled User Manual
Final Check List
After connections,
1Wash out the bin. If desired, the interior of the bin could be sanitized.
2Locate the ice scoop (if supplied) and have it available for use when needed.
Final Check List:
1Is the unit located indoors in a controlled environment?
2Is the unit located where it can receive adequate cooling air?
3Has the correct electrical power been supplied to the machine?
4Have all the water supply connections been made?
5Have all the drain connections been made?
6Has the unit been leveled?
7Have all unpacking materials been removed?
8Is the water pressure adequate?
9Have the drain connections been checked for leaks?
10Has the bin interior been wiped clean or sanitized?
11Have any water filter cartridges been replaced?
12Have all required kits and adapters been properly installed?
November 2006
Page 13