Schedule Distribution Tool

Displaying break-in programs

Displaying break-in programs

●Distributing via a network and making a break-in display

• This function is only available with the Network Version.

If ordinary schedule distribution and break-in distribution overlap, the break-in distribution has the higher priority in processing.

1.Click [Distribute schedule or program to the panel].

The [Selection of Distribution Methods] dialog box will appear.

2.Select the “Distribute the program through network and make a break-in display” radio button, and click [Next].

The [Selection of the Break-in Program] dialog box will appear.

3.Select a program, and click [Next].

The [Selection of the Distribution Target] dialog box will appear.

4.Check the check boxes for all the panels and/or groups that the schedule is to be sent to.

Clicking the buttons in the top right of the window will allow you to add or edit panels and groups in the same way as the [Panel

Management] window (Fp.78). For a description of button actions, refer to p.86.

5.Click [Next].

The [Display Time and Periods of Break-in Program] will appear.

90

Page 90
Image 90
Sharp PNSV01 operation manual Displaying break-in programs, Distributing via a network and making a break-in display