Schedule Distribution Tool

Distributing schedules

5.Check the check boxes for all the panels and/or groups that the schedule is to be sent to.

Clicking the buttons in the top right of the window will allow you to add or edit panels and groups in the same way as the

[Panel Management] window (Fp.78).

The buttons perform the following actions:

Button

Name

Description

Relevant page

 

Add Panel (Panel PC)

Adds a new panel to be managed.

Fp.79

 

 

 

 

 

Add Group

Adds a new group.

Fp.80

 

 

 

 

 

Edit Panel/Group

Changes the content of the selected panel or

Fp.79-80

 

group.

 

 

 

 

Delete Panel/Group

Deletes the selected panel or group.

Fp.81

 

 

 

 

6.Click [Next].

The [Selection of the Distribution Date Time and Option] dialog box will appear.

7.Select a “Distribution Date Time”.

“Distribute now” option button

Distributes schedule as soon as the distribution wizard exits.

“Distribute at specifed date time” option button

Distributes schedule at the set date and time.

8.Set “Distribution Options”.

“Power ON the panel PC before the distribution” check box Distributes the schedule after turning the target PC on if it is not already turned on at the time of distribution.

“Power OFF the panel PC after the distribution” check box

Turns the target PC power off after the schedule has been distributed.

9.Click [Next].

A [Confrmation] dialog box will appear.

10.Check the distribution settings, and click [Finish]. The distribution or distribution reservation will be executed.

Distribution data can be packaged and saved as a single fle that includes schedule information including programs, timetables, and content.

Click [Save the Package], and in the [Save the Package] dialog box that appears, specify a directory to save the fle to. Then enter a “File name”, and click [Save]. There is usually no need to use this function.

86

Page 86
Image 86
Sharp PNSV01 operation manual Select a Distribution Date Time, Set Distribution Options, Button Name Description Relevant