This manual must be left with owner and should be hung on or adjacent to the boiler for reference.

DIRECT-VENT SEALED COMBUSTION CONDENSING BOILER HOT WATER MODEL J-390

GAS-FIRED BOILER FOR NATURAL GAS

INSTALLATION AND OPERATING INSTRUCTIONS

TABLE OF CONTENTS

 

Boiler Dimensions and Rating

2

Identification of Parts

3

Installation Requirements

4

Contamination Prevention

5

Venting Application

5

Boiler Room Air Supply and Ventilation

5

Flue gas Venting Requirements

6

Additional Installation Requirements for Massachusetts

6

Vent Material

6

Air Intake Material

6

Vent and Air Intake Restrictions

7

Non-Direct Vent Installation

8

Sidewall Venting, Non-Direct Vent

8

Vent Termination Location and Clearance

8

Non-Direct Vent Vertical Venting

8

Direct Vent Installation

8

Sidewall Venting, Direct Vent

8

Vent/Air Intake Termination Installation

14

Direct Vent, Venting and Air Intake through a Roof

15

Venting and Air Intake Regular Inspection

16

Condensate Removal System

16

Gas Piping

16

Electrical Wiring

17

Wiring Diagram

18

Single and Multi Zoning

21

Water Piping

24

Operating Instructions

30

Boiler Control Display

30

Boiler Control

30

Sequence of Operation

36

Gas Input Rate Adjustment

37

Safety Check

38

Care and Maintenance

41

General Troubleshooting Guide

42

IMPORTANT

READ ALL OF THE FOLLOWING WARNINGS AND STATEMENTS BEFORE READING THE INSTALLATION INSTRUCTIONS

The installation must conform to the requirements of the authority having jurisdiction or, in the absence of such requirements, to the National Fuel Gas Code, ANSI Z223.1-latest edition. The installation must also conform to the additional requirements in this Slant/Fin Instruction Book.

In addition where required by the authority having juris- diction, the installation must conform to American Society of Mechanical Engineers Safety Code for Controls and Safety Devices for Automatically Fired Boilers, No. CSD-1.

WARNING

This boiler, gas piping and accessories must be installed, connected, serviced and repaired by a trained, experienced service technician, familiar with all precautions required for gas-fired equipment and licensed or otherwise qualified, in compliance with the authority having jurisdiction.

WARNING

The venting system of this boiler is under positive pressure. Leakage from this system can be hazardous and if not avoided can result in death or serious injury. In addition to the recom- mendations within this manual and the User’s Information Manual, the venting system, from the flue collector to the out- door discharge, must be carefully checked annually by a quali- fied service agency.

Heating Contractor

Boiler Model Number

Address

Boiler Serial Number

Phone Number

Installation Date

Printed in U.S.A. 708

Part No. 83-5736Publication No. J-40

Page 1
Image 1
Slant/Fin J-390 installation instructions Installation and Operating Instructions