14

Jaguar Model J-390

VENT/AIR INTAKE TERMINATION FOR PVC/CPVC VENTING INSTALLATION

This termination is designed specifically for 4” diameter PVC or CPVC Schedule 40 pipe to be used as the vent and air intake piping material, only. It can be used on a combustible wall, provided that the wall passage is cut out as specified in step 5.

1.Termination must be installed horizontally.

2.Refer to Figure 12a for installation details.

3.Wall thickness should be 3” to 14” thick.

4.Follow instruction for “vent termination location and clearances” explained on page 8.

5.Cut a rectangular opening with the following dimensions in the wall.

Height: 5 34

Width: 12 34

6.From outside of the wall, install outside termination plate using 4 screws. Make sure the louvers are at right side. Seal the plate perimeter with silicon.

7.Apply a bead of silicon around the outer surface of the out side termination plate air intake collar, about 1/2” from the edge. This will seal the air intake pipe to the air intake collar, in step #9.

8.From inside, install the inside termination plate, using 4 screws. Make sure that the holes for the vent and air intake pipe visually line up with the vent passage hole and air intake collar on the outside termination plate.

9.Cut the PVC or CPVC air intake pipe to the proper dimension to fit onto the air intake collar of the terminal. Slide the air intake pipe through the inside termination plate and onto the air intake collar, where the sealant was pre-applied in Step #7.

10.Cut the PVC or CPVC vent pipe so that it will extend out past the outer surface of the outside termination plate by 2”.

11.Cement a 4” diameter PVC or CPVC coupling onto the PVC or CPVC vent pipe, and install a stainless steel screen into the coupling.

12.From outside the wall, insert the bare end of the PVC or CPVC vent pipe through the outside and inside terminal plates, until the coupling is flush with the outside wall plate.

13.From inside, proceed with the air intake and vent pipe installation. Follow the proper PVC/CPVC assembly practices specified on page 7, and venting system restrictions specified on page 7 of this manual.

VENT/AIR INTAKE TERMINATION FOR STAINLESS STEEL VENTING INSTALLATION

This termination is easily modified for Heat-Fab Saf-T vent 4” diameter stainless steel venting system to be used as the vent, by installing the special reducing rings provided in the optional stainless steel flue pipe kit, with 4” diameter PVC or CPVC schedule 40 pipe to be used as the air intake piping material, only. It can be used on a combustible wall, provided that the wall passage is cut out as specified in step 5.

1.Termination must be installed horizontally.

2.Refer to Figure 12b for installation details.

3.Wall thickness should be 3” to 14” thick.

4.Follow instruction for “vent termination location and clearances” explained on page 8.

5.Cut a rectangular opening with the following dimensions in the wall.

Height: 5 34

Width: 12 34

6.Install the reducing rings on the inner facing side of the outside and inside termination plates (see figure 12b).

7.From outside of the wall, install outside termination plate using 4 screws. Make sure the louvers are at right side. Seal the plate perimeter with silicon.

8.Apply a bead of silicon around the outer surface of the outside termination plate air intake collar, about 1/2” from the edge. This will seal the air intake pipe to the air intake collar, in step #10.

9.From inside, install inside termination plate using 4 screws.

10.Cut the PVC or CPVC air intake pipe to the proper dimension to fit onto the air intake collar of the terminal. Slide the air intake pipe through the inside termination plate and onto the air intake collar, where the sealant was pre-applied in Step #8.

11.Assemble and seal straight screened termination to the slip joint connector.

12.From outside of the building, insert vent pipe (slip joint connector and termination assembly) through the 4” holes of the outside and inside termination plate.

13.From inside, proceed with air intake and vent pipe installation. Follow vent manufacturer’s instructions and restrictions specified on page 7 of this manual.

Page 14
Image 14
Slant/Fin installation instructions Jaguar Model J-390