Smith Cast Iron Boilers GB300 warranty Manifold Attachments, front base splice channel, Figure

Models: GB300

1 52
Download 52 pages 14.03 Kb
Page 15
Image 15
Manifold Attachments

Page 15

GB300 BOILER INSTALLATION AND OPERATION INSTRUCTIONS

NOTE:The base front panels bolt to the inside of the

Figure 18

Manifold Attachments

front base splice channel, Figure 15.

 

 

Figures 15

Base Front Panel Detail

 

 

Use a spirit level to plumb the front and rear panels before tightening the nuts and bolts, Figure 16. Temporarily attach the manifold brackets and manifold, Figures 17 and 18.

Figure 16

Plumbing Base

Locate the Burner Box. It is marked with a number from 72724 to 72731. Install three burner tubes in the base, one on each end and one in the middle. Slide the closed end of the burner tube through the slot in the burner base rear panel. The notch in the burner must engage the burner base rear panel, Figure 19.

Figure 19

Burner Tube Installation

Notch

Notch Engaged

Figure 17

Manifold Bracket Attachment

Adjust the manifold and base so the burner tube orifice

 

 

bracket is approximately in the middle of the orifice on

 

 

all three burners, Figure 20.

 

 

 

Figure 20

Burner Tube Adjustment

Page 15
Image 15
Smith Cast Iron Boilers GB300 warranty Manifold Attachments, front base splice channel, Figure, Figures, Plumbing Base