Smith Cast Iron Boilers GB300 warranty Figure, Manifold Bracket Attachment, Manifold Installations

Models: GB300

1 52
Download 52 pages 14.03 Kb
Page 26
Image 26
Manifold Installations

Page 26

GB300 BOILER INSTALLATION AND OPERATION INSTRUCTIONS

MANIFOLD, BURNER AND PILOT INSTALLATION Figure 59

Burner Tube w/ Pilot Bkt. and Pilot

Box 63273, Base Panel Sides, contains the manifold

 

brackets. Bolt the left and right manifold brackets to the

 

front burner base side panel flanges, Figures 16 and 57.

 

Figure 57

Manifold Bracket Attachment

 

Figure 60

1/4" Pilot Tube

Place the manifold on the brackets and bolt it to the brackets leaving the 5/16 bolts finger tight, Figure 58.

Figure 58

Manifold Installations

The burners are in the Burner Box that has a number from 72724 to 72731 on it. Locate the burner with the pilot mounting bracket welded to it, Figure 59. There will be two burners with pilot mounting brackets for 13 through 21 section boilers.

Attach the pilot(s) to the burner tube(s) using the allen head screw(s) provided, Figure 59. Remove the roll of 1/4" aluminum tubing and cut an 36" long piece from it, Figure 60. Ream and clean the tubing so it’s free from burrs.

Insert the tubing into the brass ferule on the pilot and tighten it with a wrench, Figure 61. Bend tubing to run parallel to burner tube exiting front of boiler. Avoid tight radius.

Figure 61

Burner Tube and Pilot Assembly

Page 26
Image 26
Smith Cast Iron Boilers GB300 warranty Figure, Manifold Bracket Attachment, Manifold Installations