Smith Cast Iron Boilers GB300 warranty Figure, Flue Collector Placement, Draft Hood Installation

Models: GB300

1 52
Download 52 pages 14.03 Kb
Page 24
Image 24
Flue Collector Placement

Page 24

GB300 BOILER INSTALLATION AND OPERATION INSTRUCTIONS

Position the flue collector(s) on the boiler sections with the draft hood opening(s) at the rear of the boiler. The sides of the flue collector(s) should lie along the center of each end section, Figure 48. Attach the flue collector(s) to the flue collector mounting brackets using the #10 sheet metal screws supplied, Figure 49.

Attach the draft hood(s) to the flue collector(s) using the #10 screws provided, Figure 50. On the 13 through 21 section boilers it will be necessary to lift one draft hood/ flue collector up to install the six screws on the two inner sides, Figure 51.

Figure 48

Flue Collector Placement

Figure 50

Draft Hood Installation

Figure 49

Flue Collector Bracket Installation

Figure 51 Draft Hood Attachment 13 to 21 Sections

Page 24
Image 24
Smith Cast Iron Boilers GB300 warranty Figure, Flue Collector Placement, Draft Hood Installation