GB300 BOILER INSTALLATION AND OPERATION INSTRUCTIONS

Figure 78

Rear Top Jacket Panel, 5 through 12

Figure 81

FrontTop Jacket Panel, 13 through 21

Figure 79

Rear Top Jacket Panel, 13 through 21

Bend the top panel(s) down along the perforation and

 

 

attach the front portion of the top to the flange edges

 

 

of each side panel, Figure 82.

 

 

Figure 82

Front Top Jacket Panel Detail

Install the front jacket top panel(s), Figures 80 and 81.

Figures 80 Front Top Jacket Panel, 5 through 12