Smith Cast Iron Boilers GB300 warranty Figures, Rear Panel Installation, 5 through

Models: GB300

1 52
Download 52 pages 14.03 Kb
Page 29
Image 29
Rear Panel Installation, 5 through 12

Page 29

GB300 BOILER INSTALLATION AND OPERATION INSTRUCTIONS

The jacket should be assembled using the black screws

Figures 71

Box 72694, Jacket Splice Box

provided. On 5 through 12 section models slide the rear

 

 

panel behind the draft hood flanges with the grill side on

 

 

the floor, Figures 68, 69 & 70. On 13 to 21 section boilers

 

 

open Box 55185, Jacket Splice Box, Figure 71. Screw

 

 

the two rear jacket panels to the rear jacket panel splice

 

 

panel, Figure 72, before sliding the panels behind the

 

 

draft hoods.

 

 

 

Figures 68

Rear Panel Installation, 5 through 12

 

 

Figures 72 Rear Panel Installation, 13 through 21

Figures 69 Rear Panel Installation, 5 through 12

Fasten the rear jacket panel(s) to the inner draft hood and flue collector flanges using the holes provided, Figure 73.

Figures 73

Rear Panel Installation

Figures 70 Rear Jacket Panel Installation Detail

Page 29
Image 29
Smith Cast Iron Boilers GB300 Rear Panel Installation, 5 through, Figures 72 Rear Panel Installation, 13 through