WHAT TO DO IF YOU SMELL GAS
INSTALLATION & OPERATING MANUAL
GB300 NATURAL OR PROPANE GAS BOILER
QUE FAIRE SI VOUS SENTEZ UNE ODEUR DE GAZ
Concrete Block Base Construction
BOILER RATINGS & CAPACITIES
BOILER LOCATION
Figure
Table 1 Make-upAir Duct Sizing
Wire Screen
All Air From Inside The Building
All Air From Outside The Building
CHIMNEY & VENT PIPE CONNECTIONS
VENT CONNECTIONS
Chimney Inspection & Sizing
COMMON VENT SYSTEMS
Figure 2A
2 FT 0.6 m 10 FT 3.4 m 3 FT 0.9 m 5 FT 4.5 m
Figure 2B
Dual Flue Outlets And Inside Air GB300 Series
Figure 2C
10 FT 3.1 m 3 FT 0.9 m 3 FT 0.9 m
Figure 2D
Figure 2E
Common Vents And Inside Air GB300 Series
BUILDING OVERHANG
Figure 2G
Horizontal Venting And Inside Air GB300
10 FT 3.1 m 3 FT 0.9 m 3 FT 0.9 m
Figure
Burner Base Assembly General Instructions
Figure
Burner Base Box 63265 to
Figure 9A Burner Base Rear Panel, 5 - 12 Sect
Burner Base Assembly 5 through 12 Sections
Figure
Burner Base Side Panels, 5 -
X7 Box
Splice Channel Assembly 13 to 21 Sections
Splice Channel Assembly 13 to 21 Sections
Figure
Figure 14B
Figure 13B
Figure 14A
Base Rear Channel Bolt Holes
front base splice channel, Figure
Burner Tube Adjustment
Figure
Manifold Attachments
Figure 22C
Figure 22B
Figure
Burner Base Splice Panel Bracket
Figure
Ceramic Blanket Installation
Figure 24Ceramic Blanket Placement
Cast Iron Section Assembly
Figure
occur voiding the warranty
Figure 26B
Marking Burner Base Rear Midpoint
Rear View - Odd Numbered Models
Figure 35 Section Placement on Burner Base
Figure
Figure
Figure
Lower Port Seal Placement
Draw Rod Installation
Figure
Confirming Sections Are Plumb
Figure 40 Flue Collector Box 63203 to
Figure
Figure
Figure
“J” Bolt Installation
Flue Collector Bracket Installation
Figure
Figure
FLUE COLLECTOR INSTALLATION
Figure 47A Ceramic Blanket Placement 5-12Sect
Figure 47B Ceramic Blanket Placement 13-21Sect
Figure
Flue Collector Placement
Draft Hood Installation
Flue Collector Bracket Installation
Clean Out Cover Bolt Assembly
Clean Out Covers
Clean Out Cover Bolt Location
Clean Out Cover Insulation
Figure
Manifold Installations
Figure
Manifold Bracket Attachment
Figure 64 BurnerTube LockedTo Rear Base Panel
Follow all applicable local codes
Figure
Figure 62 Burner Tube Through Rear Base Panel
Figure
JACKET INSTALLATION
Figure
Figure
Figures 70 Rear Jacket Panel Installation Detail
Rear Panel Installation, 5 through
Figures 72 Rear Panel Installation, 13 through
Figures 69 Rear Panel Installation, 5 through
controls
Figure
55175, Jacket Side Panels. Remove the knockouts
necessary to attach the water or steam piping and
Figure
Figure
Rear Top Jacket Panel, 5 through
Figure
Figure
Figure
Figure
Splice Panel Brackets
Front Access Panel 13 - 21 Sect
Front Access Panel 5 - 12 Sect
Grill Assembly
Splice Grill Assembly
Figure
Pilot Assembly
Gas Train Assemblies
Figure
HEATING SYSTEM PIPING
Figure
WATER BOILER PIPING CONNECTIONS
Return Size in
Table
Boiler Model
Supply Size in
Pres Controls LWCO Stop Valve Check Valve Blowoff
Figure 97 Water Boilers in Battery
Stop Valve Steam Main ASME Safety Valve F & T
Figure 97A Typical Single Boiler Steam Piping
Stop Valve Check Valve
Risers
Equivalent Pipe Length Chart
Table
Boiler Model
Figure
Electrical Power Connections
Figure
Gas Supply Piping
Water Boilers
Wire Duct and Control Box
Thermostat Installation
Figure
LIGHTING INSTRUCTIONS
Continuous Pilot Systems
Intermittent Pilot Ignition Systems
To Turn Off Gas To Boiler
BOILER CHECKING & ADJUSTMENT PILOT ADJUSTMENT
Pilot Flame Adjustment
Gas Pressure Adjustment
Low Water Cutoff
BOILER MAINTENANCE
Thermostat Adjustment
Input Rate
Controls
Burner Installation
Heat Exchanger Cleaning
Vent System
Page
Ref #
Manifold Less Orifices
Ref #
Ref #
SHOULD PERFORM WORK ON YOUR SMITH BOILER
ONLY QUALIFIED, LICENSED SERVICE CONTRACTORS
WESTCAST, INC 260 NORTH ELM STREET WESTFIELD, MA