Southbend SB1029 owner manual Preparation Overview, Things Youll Need

Models: SB1029

1 60
Download 60 pages 36.91 Kb
Page 11
Image 11

For Machines Mfg. Since 8/09

P R E P A R A T I O N

Model SB1029

Preparation Overview

The list below outlines the basic process to follow to prepare your machine for operation. Specific steps for each of these points will be covered in detail later in this section.

The typical preparation process is as follows:

1.Unpack the machine and inventory the contents of the box/crate.

2.Clean the machine and its components.

3.Identify an acceptable location for the machine and move it to that location.

4.Level the machine and either bolt it to the floor or place it on mounts.

5.Finish assembling the machine by installing the necessary components from the inventory, and make any necessary adjustments or inspections to ensure the machine is ready for operation.

6.Connect the machine to the power source.

7.Test run the machine to make sure it functions properly and is ready for operation.

Things You'll Need

During the setup process, operation, and maintenance of your machine, you'll need the following items:

For Lifting

ssA forklift or other power lifting device rated for the weight of the machine.

ss,IFTINGT3TRAP or Chain (rated for at least 2500 lbs.)

For Power Connection

ss!!POWEROSOURCE THATOMEETSCTHE MINIMUMT circuit requirements for this machine. (Refer to the Power Supply Requirements

section for details.)

ss!!QUALIFIEDLELECTRICIAN TO ENSURETARSAFE AND code-compliant connection to the power source.

For Assembly

ssAnother Person ss Cotton Rags ss Mineral Spirits ss 3AFETY 'LASSES ss Wrench 19mm

ss Oil Can Filled with Oil Listed in Maintenance

-9-

Page 11
Image 11
Southbend SB1029 owner manual Preparation Overview, Things Youll Need