State Industries SBD71 120 Main Gas Valve Coil Check, Sbd Tank Type Heaters Service Handbook

Models: SBD85 500 SBD71 120

1 56
Download 56 pages 57.8 Kb
Page 41
Image 41
STEP 18B

SBD TANK TYPE HEATERS

SERVICE HANDBOOK

STEP 18B

MAIN GAS VALVE COIL CHECK

PILOT GAS

 

MANIFOLD

 

PRESSURE

 

TAP

 

BLUE

 

WHITE

The PV wire is connected to the blue wire

RED

 

The MV/PV wire on the IID is connected to the white wire.

The MV wire is disconnected from the gas valve.

MANIFOLD

GAS

MANIFOLD

PRESSURE

 

 

TAP

STEP 18B. MAIN GAS VALVE COIL CHECK – SBD 500 ONLY

Condition:

Pilot lights

Sparking stops

No main burner ignition Test Procedure:

Power off

Disconnect red, main valve wire from module MV terminal

Meter set to test for DC amperage

10A wire to red gas valve wire, COM wire to MV terminal of ignition module

Turn power on to heater

After pilot lights and sparking stops

IF:

THEN:

.25 to .35 DC Amps is not present

Replace the gas valve

.25 to .35DCA is present

Main burner gas should ignite.

Be certain to correct you meter wire connections and setting before performing further tests.

Technical Training Department

40

Ashland City, TN ©2003

Page 41
Image 41
State Industries SBD71 120, SBD85 500 manual Main Gas Valve Coil Check, Sbd Tank Type Heaters Service Handbook, Then