State Industries SBD71 120, SBD85 500 manual Sbd Electrical Sequence Of Operation, 115/60/12A

Models: SBD85 500 SBD71 120

1 56
Download 56 pages 57.8 Kb
Page 19
Image 19
SBD ELECTRICAL SEQUENCE OF OPERATION

SBD TANK TYPE HEATERS

SERVICE HANDBOOK

SBD ELECTRICAL SEQUENCE OF OPERATION

115/60/12A

120 VAC to Junction Box

On / OFF Switch "ON"

24V Transformer

Tank Temperature

Calling for Heat

High Limit Closed

Thermostat Closed

Motor Opens

Damper

Cam On Damper Blade Closes Proving End Switch

IID Module

(24V) Receives Voltage

Tank Temperature

Satisfied

High Limit (ECO)

Closed

Motor Closes

Damper

Module (PV) Terminal Sends 24V to Pilot Coil

Module (Spark) Sends 10,000V Spark to Pilot

Pilot Ignites and Proves Flame

Spark Stops

Module (MV)

Terminal Sends 24V

To Main Gas Coil

Main Burner Heats Tank

Themostat Opens

Power to Damper

#2 Interrupted

Damper Motor Energized and Damper Closed

90 Second Trial /

5 Minute Delay Between

Trials - Continuously

Technical Training Department

18

Ashland City, TN ©2003

Page 19
Image 19
State Industries SBD71 120 manual Sbd Electrical Sequence Of Operation, 115/60/12A, Sbd Tank Type Heaters Service Handbook