SBD TANK TYPE HEATERS
SERVICE HANDBOOK
SBD ELECTRICAL SEQUENCE OF OPERATION
115/60/12A
120 VAC to Junction Box
On / OFF Switch "ON"
24V Transformer
Tank Temperature
Calling for Heat
High Limit Closed
Thermostat Closed
Motor Opens
Damper
Cam On Damper Blade Closes Proving End Switch
IID Module
(24V) Receives Voltage
Tank Temperature
Satisfied
High Limit (ECO)
Closed
Motor Closes
Damper
Module (PV) Terminal Sends 24V to Pilot Coil
Module (Spark) Sends 10,000V Spark to Pilot
Pilot Ignites and Proves Flame
Spark Stops
Module (MV)
Terminal Sends 24V
To Main Gas Coil
Main Burner Heats Tank
Themostat Opens
Power to Damper
#2 Interrupted
Damper Motor Energized and Damper Closed
90 Second Trial /
5 Minute Delay Between
Trials - Continuously
Technical Training Department | 18 |
Ashland City, TN ©2003 |