If the connector stops or binds with about 2 mm still to go, back out and repeat from Step c.

e.Continue to push the connector in until the hooks catch onto the top of the connector on the line card.

5.Repeat from Step 2 for the second cable connecting to connector 23B.

6.Repeat from Step 2 moving to the left for cables connecting to connector 22A, 22B, 21A, and so on to 12B.

7.Repeat from Step 2 moving to the right for cables connecting to connector 0A, 0B, 1A, and so on to 11B.

Chapter 2 Chassis Service Procedures 2-25

Page 43
Image 43
Sun Microsystems 820-4733-10 service manual Chassis Service Procedures