Sun Microsystems 96257 manual Planning Worksheet 1 of, Account Completed By Date

Models: 96257

1 118
Download 118 pages 44.52 Kb
Page 103
Image 103
Planning Worksheet 1 of 5

Planning Worksheet 1 of 5

> [electronic form] <

Account __________________________ Completed By ____________________ Date ___________

 

Site Readiness Planning Factors

 

Information to Note / Comments

 

 

 

 

 

 

 

 

1A.

Installation teams defined?

1A.

 

 

 

 

 

 

 

 

 

1B.

Installation schedule created?

1B.

 

 

 

 

 

 

 

 

1C.

HVAC requirements compliance verified?

1C.

 

 

 

 

 

 

 

 

 

1D.

Power requirements compliance verified?

1D.

 

 

 

 

 

 

 

 

1E.

Flooring requirements compliance verified?

1E.

 

 

 

 

 

 

 

 

 

1F.

Future expansion considered?

1F.

 

 

 

 

 

 

 

 

1G.

Floor plans completed?

1G.

 

 

 

 

 

 

 

 

 

1H.

Cable routing established?

1H.

 

 

 

 

 

 

 

 

1I.

Delivery team identified?

1I.

 

 

 

 

 

 

 

 

 

1J.

Doorway clearances verified for transit of VTSS

1J.

 

 

 

cabinet(s) between dock and installation area?

 

 

 

 

 

 

 

1K.

Delivery dock receiving time scheduled?

1K.

 

 

 

 

 

 

 

 

 

1L.

Pallet jack / forklift availability verified?

1L.

 

 

 

 

 

 

1M. Incline compliance of ramp(s) verified?

1M.

 

 

 

 

 

 

 

 

 

1N.

Elevator capacity verified?

1N.

 

 

 

 

 

 

1O. Pre-staging area readiness verified?

1O.

 

 

 

 

 

 

 

 

 

1P.

Site and data center access arranged?

1P.

 

 

 

 

 

 

 

 

 

Additional Information to Note / Comments (Specify By Above Item Number):

Sun Confidential: Internal Only

Page 103
Image 103
Sun Microsystems 96257 manual Planning Worksheet 1 of, Account Completed By Date, Site Readiness Planning Factors