Site Readiness Planning

Site Evaluation – External Considerations

Several months before delivery of VSM5 system equipment, a readiness planning team should identify and evaluate all external site factors that present existing or potential haz- ards, or which could adversely affect delivery, installation, or operation of the system. Ex- ternal factors that should be evaluated include:

Reliability and quality of electrical power provided by the local utility, backup power gen- erators, and uninterruptible power supplies (UPSs), etc.

Proximity of high-frequency electromagnetic radiation sources (e.g., high-voltage power lines; television, radio, and radar transmitters)

Proximity of natural or man-made floodplains and the resultant potential for flooding in the data center

Potential effects of pollutants from nearby sources (e.g., industrial plants).

If any existing or potential negative factors are discovered, the site readiness planning team should take appropriate steps to eliminate or mitigate those factors before VSM5 system equipment is delivered. Sun Global Services offers consultation services and other assistance to identify and resolve such issues. Contact your Sun account representative for more information.

Site Evaluation – Internal Considerations

Several months before delivery of VSM5 system equipment, a readiness planning team should identify and evaluate all internal site factors that present existing or potential haz- ards, or which could adversely affect delivery, installation, or operation of the system. In- ternal factors that should be evaluated include:

Structural dimensions, elevator capacities, floor-load ratings, ramp inclines, and other considerations when transfering equipment point-to-point between the delivery dock, staging area, and data center installation site

Site power system(s) design and capacity

VSM5 system equipment power system design and capacity

Data center safety system design features and capabilities

Data center environmental (HVAC) design features and capabilities

Potential effects of corrosive materials, electrical interference, or excessive vibration from sources in close proximity to system equipment.

If any existing or potential negative factors are discovered, the site readiness planning team should take appropriate steps to eliminate or mitigate those factors before VSM5 system equipment is delivered. Sun Global Services offers consultation services and other assistance to identify and resolve such issues. Contact your Sun account representative for more information.