Planning Worksheet 5 of 5

> [electronic form] <

Account __________________________ Completed By ____________________ Date ___________

 

AC Power Factors

 

 

Information to Note / Comments

 

 

 

 

 

5A. Does the installation site have capability for grounding

5A.

 

 

 

 

 

 

 

the VTSS cabinet(s)?

 

 

 

 

 

 

 

 

5B. Is the installation site close enough to source power

 

 

 

 

 

 

 

 

 

connectors / outlets to accommodate the power cord

5B.

 

 

 

 

lengths ordered for the VTSS cabinet(s)?

 

 

 

 

 

 

 

 

 

 

5C. Are power cable routing paths readily accessible to fa-

5C.

 

 

 

 

 

 

 

cilitate cable connection / disconnection and servicing?

 

 

 

 

Host System and Application Software Factors

 

 

Information To Note / Comments

 

 

 

 

 

 

5D. What host operating system software will be used with

5D.

(1)

_____________________________________

 

 

this VSM solution configuration? Requirements:

 

 

 

 

 

 

 

(1) MVS 5.2.2 or higher. (2) All versions of OS390.

 

 

 

 

 

(2)

_____________________________________

 

 

 

 

 

 

 

 

 

 

5E.

What application software release levels (SRLs) will be

5E.

 

installed for use with this VSM solution configuration?

(1)

 

_____________________________________

 

 

Requirements: For back-end FICON (1) VTCS.

 

 

 

 

 

(2) NCS 6.1 or higher (includes HSC 6.1).

(2)

 

_____________________________________

 

 

 

 

 

 

 

 

 

5F.

5F.

What patches, if any, are needed for host and applica-

(1)

 

_____________________________________

 

 

 

 

 

 

tion software to run properly with this VSM solution

(2)

 

_____________________________________

 

 

configuration? Key: (1) = VTCS. (2) = NCS. (3) = MVS.

 

 

 

 

 

 

 

 

 

 

(4) = OS390.

(3)

 

_____________________________________

 

 

 

 

 

 

(4)

 

_____________________________________

 

 

 

 

 

 

 

 

Remote Support Factors

 

 

Information To Note / Comments

 

 

 

 

 

 

5G.

What components will the customer provide to enable

 

 

 

 

 

 

 

 

 

remote event notification functionality for this VSM solu-

5G.

 

 

 

tion?

 

 

 

 

 

 

 

 

 

 

5H. What components will Sun Microsystems provide to en-

 

 

 

 

 

 

 

 

 

able remote event notification functionality for this VSM

5H.

 

 

 

solution?

 

 

 

 

5I.

What cable types and lengths are needed to attach a

 

 

 

 

 

 

 

 

 

modem, SDP device, or other remote monitoring com-

5I.

 

 

 

ponents to the VTSS cabinet(s)?

 

 

 

 

 

 

 

 

 

 

Additional Information to Note / Comments (Specify By Above Item Number):

Sun Confidential: Internal Only

Page 107
Image 107
Sun Microsystems 96257 manual Planning Worksheet 5