Sun Microsystems 96257 manual Planning Worksheet 2 of, Delivery and Handling Factors

Models: 96257

1 118
Download 118 pages 44.52 Kb
Page 104
Image 104
Planning Worksheet 2 of 5

Planning Worksheet 2 of 5

> [electronic form] <

Account __________________________ Completed By ____________________ Date ___________

 

Delivery and Handling Factors

 

 

Information to Note / Comments

 

 

 

 

 

 

2A. Does the customer have a delivery dock? If NO, where

 

 

2A.

 

 

 

will the VTSS cabinet(s) be delivered?

 

 

 

 

 

 

 

 

 

 

2B. Are there street or alley limitations that will hinder

2B.

 

 

 

delivery of the VTSS cabinet(s)?

 

 

 

 

 

 

 

 

 

2C. Is the delivery dock available only during specific

2C.

 

 

 

 

 

hours? If YES, what are the hours of availability?

 

 

 

 

 

 

 

 

 

 

 

 

 

2D. Which specific persons (by name) will be used to move

 

 

 

 

 

 

 

and position the VTSS cabinet(s)? Note: A packaged

2D.

 

 

and fully-populated VTSS cabinet weighs up to 445 kg

 

 

 

 

 

 

(982 lbs.).

 

 

 

2E.

Will a pallet jack or forklift with adjustable forks be avail-

 

2E.

 

 

 

able for moving the VTSS cabinet(s)?

 

 

 

 

 

 

 

 

 

 

2F.

Is there a freight or public elevator available for moving

 

 

 

 

 

 

 

the VTSS cabinet(s) to the staging and installation ar-

2F.

 

 

 

eas, or must stairs be used?

 

 

 

2G.

Are there ramps along the path between the delivery

 

 

 

 

 

 

 

dock and final installation area? If YES, have all ramp

2G.

 

 

inclines been verified to be within specification to pre-

 

 

vent tipping of the VTSS cabinet(s)? Note: Ramp

 

 

 

 

 

 

 

 

 

 

 

incline angles must NOT exceed 10 degrees.

 

 

 

 

 

 

 

 

 

 

2H. Are floors along the transit path to the installation area

2H.

 

 

 

 

 

rated to support the VTSS cabinet(s)?

 

 

 

 

 

 

 

 

 

 

 

 

 

Additional Information to Note / Comments (Specify By Above Item Number):

Sun Confidential: Internal Only

Page 104
Image 104
Sun Microsystems 96257 manual Planning Worksheet 2 of, Delivery and Handling Factors, Account Completed By Date