3.Press the Attention button.

The power LED should blink about 10 times then remain a steady green light.

To Verify the ExpressModule Installation

1.Use the cfgadm command to verify the ExpressModule installation:

#cfgadm

If the ExpressModule is properly installed and connected, you should see output similar to the following:

Ap_Id

Type

Receptacle Occupant

Condition

pcie5

etherne/hp

connected

configured

ok

 

 

 

 

 

 

 

2.Use the dladm show-devcommand to verify that the link is up.

#dladm show-dev

You should see output similar to the following:

e1000g2

link:

up

speed:

1000

Mbps

duplex:

full

e1000g3

link:

up

speed:

1000

Mbps

duplex:

full

 

 

 

 

 

 

 

 

Chapter 2 Installing the Adapter 19

Page 53
Image 53
Sun Microsystems Gigabit Ethernet MMF/UTP Adapter To Verify the ExpressModule Installation, Press the Attention button