Turbomachinery Package Specification | Taurus 60 Compressor Set and Mechanical Drive |
|
|
If a resonance condition (interference) is found, then a fatigue analysis is performed to confirm the resonance will not cause fatigue failure in the shafting.
18.5.2Lateral Analysis Report (Optional)A lateral forced response analysis of the driven equipment can be performed to confirm that any lateral critical speeds aren’t close enough to the operating speed range to cause lateral vibration problems.
Table 15. Preservation, Installation, and Documentation SpecificationsMechanical Installation Requirements
Mounting |
|
|
Space Between Units In | A Minimum of 2.4 m (8 ft) | |
Installations |
|
|
Lube Oil Cooler(s) |
|
|
Top of The Lube Oil Cooler(s) | Not Be More Than 9.1 m (30 ft) Above The Bottom | |
|
| of The Package Frame, See Note a |
Total oil volume of “Outgoing and Return” Lines | 1282 L (340 gal) | |
Total Combined Pressure Drop of The Supply | Should Not Exceed 345 kPag (50 psig) | |
and Return Lines and Lube Oil Cooler(s) |
| |
Start, Fuel, Lube, Air/Drain System Schematics |
| |
Compliance |
| American National Standards Institute (ANSI) |
|
| Y32.10 |
Solar’s Applicable Engineering Specifications |
| |
ES | Interpretation of Drawing Requirements | |
ES | Traceability Requirements Critical Parts, Engine and Related Systems | |
ES 2231 | Standards and Practices for The Design and Installation of Cable Channels and | |
| TC Rated Cables Installed In Class 1, Division 2 Hazardous Areas | |
ES | Leveling and Installing of Package Bases | |
Solar’s Applicable Product Information Letters |
| |
PIL 097 | Package Preservation and Preparation for Shipment | |
PIL 181 | Package |
|
PIL 184 | Order Fulfillment & Documentation for Oil & Gas Projects | |
Solar’s Applicable Guidelines |
| |
Package Installation Guidelines – Compressor Sets and Mechanical Drives | ||
Notes: |
|
|
(a)This is to prevent oil tank flooding in the event of a drain back.
© 2009 Solar Turbines Incorporated. All rights reserved. | TPS60CSMD/309 |