21
Model H63 OperatingPro cedures
Step 6
Install the rear drip pan. Slide the drip pan into the hole
in the front panel.
Figure 12
Step 7
Install the torque arm. Position the torque arm by
slipping it up through the slot in the operating arm, and
then down into the hole in the torque rotor shaft. Check
the torque arm by moving it back and f orth to be sure
it moves freely and easily.
Step 8
Install the front drip tray and splash shield.
Figure 13
Step 9
Slide the three o--ringsinto t he grooves of the inner air
tube.
Figure 14
Slide the two o--rings into the grooves of the outer air
tube.
Figure 15
Step 10
Lay the inner air tube, outer air tube, and agitator in the
bottom of the mix hopper for sanitizing.
Figure 16