Taylor 342 manual Step, Models 340, 341, Operating Procedures

Models: 341 342 340

1 43
Download 43 pages 12.66 Kb
Page 15
Image 15

Step 3

If the blades are in good condition, install the scraper blade clip over the scraper blade. Place the rear scraper blade over the rear holding pin (knife edge to the outside). Holding the blade on the beater, turn it over and install the front blade the same way.

Figure 6

Insert the torque rotor shaft, plastic bearing end first, making sure that it fits into the hole in the beater drive shaft. Rotate it several times to check for proper positioning. The hole in the torque rotor shaft should be in the 12 o’clock position.

Figure 4

Holding the blade in position, insert the beater assembly into the freezing cylinder and slide it into position over the drive shaft. Turn the beater slightly to be certain that the beater is properly seated. When in position, the beater will not protrude beyond the front of the freezing cylinder.

10362

Figure 5

Step 4

Install the torque rotor shaft. Slide the o-ring into the groove on the front of the shaft and lubricate these parts to prevent leaking. Place the white, plastic guide bearing on the rear of the rotor shaft. DO NOT lubricate the guide bearing.

Figure 7

Step 5

Assemble the freezer door with the “Ice Buster” (door spout clearing device). To assemble the door with the ice buster, install the o-rings on the draw valve and lubricate.

Figure 8

020807

Models 340, 341, 342

11

Operating Procedures

 

 

 

Page 15
Image 15
Taylor 342 manual Step, Models 340, 341, Operating Procedures