Thermo Products 100n, chx-3 75n, 125n operation manual S7 DIP Switch, Switch Settings, Options, Time

Models: 125n 100n chx-3 75n

1 67
Download 67 pages 17.21 Kb
Page 40
Image 40
S7 DIP Switch

All installations and services must be performed by qualified service personnel.

4.BLOWER AND CONTROL PANEL WIRING

Figure 21

Switch SettingsOptionsTimeManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background : TURN OFF THE ELECTRICAL POWER to the furnace before attempting to disconnect blower wiring.

Table 4B

S7 DIP Switch

 

Switch Settings

Options

Thermostat

S7-1

S7-2

Time

Off

Off

Off *

Type and

On

Off

10 Min

W2 Delay

Off

On

Auto

 

On

On

20 Min

 

S7-3

S7-4

Time

Heat Fan

Off

Off

90 Sec

Off

On

120 Sec *

Off Delay

On

Off

150 Sec

 

 

On

On

180 Sec

* Factory Setting / 2 Stage Thermostat setting

34

Page 40
Image 40
Thermo Products 100n, chx-3 75n, 125n operation manual S7 DIP Switch, Switch Settings, Options, Time