![](/images/new-backgrounds/1044550/4455079x1.webp)
Start Up
2.ReliaTel Control
Using the Service Test Guide in Table 5, p. 35, continue the SERVICE TEST
Momentarily jump across the Test 1 & Test 2 terminals on LTB one additional time if continuing from previous component
3.Verify that the heater stage is operating properly.
4.Clamp an amp meter around one of 2nd stage heater power wires at the heater contactor (if applicable).
5.ReliaTel Control
Using the Service Test Guide in Table 5, p. 35, continue the SERVICE TEST
6.Verify that the heater stage is operating properly
7.To stop the SERVICE TEST, turn the main power disconnect switch to the “Off” position or proceed to the next component
Final System Setup
After completing all of the
•Program the Night Setback (NSB) panel (if applicable) for proper unoccupied operation. Refer to the programming instructions for the specific panel.
•Verify that the Remote panel “System” selection switch, “Fan” selection switch, and “Zone Temperature” settings for automatic operation are correct.
•Inspect the unit for misplaced tools, hardware, and debris.
•Verify that all exterior panels including the control panel doors and condenser grilles are secured in place.
•Close the main disconnect switch or circuit protector switch that provides the supply power to the unit’s terminal block or the unit mounted disconnect switch.
40 | Packaged Heat Pump • |