Installation (continued)
Multilevel Installations
The number of computers that can be added to your installation can be greatly expanded by performing a multilevel installation. The
•Daisy chained
•Cascaded
•Daisy chained plus cascaded
Overview
Daisy chaining refers to connecting two KVM switches via dedicated daisy chain ports. The switches are strung together in a chain (see the diagram on p. 11).
With daisy chaining, none of the switch’s CPU ports are used to connect to the next switch. The port capacity of a
Cascading involves using the CPU ports of a Parent KVM switch (one that is above a switch linked down from it) to connect to a Child KVM switch. Cascading adds capacity to a KVM installation, but the parent loses one CPU port for each cascaded KVM.
The
Daisy Chaining
Up to 7 additional
In a complete daisy chained installation, the four consoles that belong to the Master switch can access and control all of the computers (up to 256) on the installation. The four consoles belonging to each Slave switch only control the computers (up to 32) connected to their switch.
To set up a daisy chained installation, refer to the diagram on page 11 and do the following:
1.Make sure that power to all the devices you will be connecting up has been turned off.
2.Use a daisy chain cable set (described in the Cables section, p. 3), to connect the Chain Out port of the parent
Note: You cannot use the Chain In port of the First Station
3.If you wish to install any consoles on this switch, follow the procedure described for the Single Stage Installation on p. 8.
4.Use Cat5e cabling and a Server Interface Module (described in the Cables section, p. 4), to connect any available CPU Port on the
5.Repeat the above steps for any additional
6.Plug the power cord into an AC power source and into the
7.Power up the installation according to the following procedure:
a.Switch on the power for the First Station. Wait for the unit to ascertain its Station ID and dis- play it on the Station ID LED. (The Station ID for the First Stage unit is 01, the ID for the Second Stage unit is 02, the ID for the Third Stage unit is 03, etc.).
b.Switch on the power for each Station on the installation in turn (Second Station, then Third Station, etc.). In each case, wait for the Station ID to be ascertained and displayed on the cur- rent Station before powering on the next one.
c.After all the Stations are up, power on the computers.
10