Chapter 8
Installation Checklist, Commissioning & Maintenance
Introduction
In this Chapter
The
When the panel arrives on site the installer must unpack and check the panel, mount the cabinet, any additional cards, and check the configuration before applying power.
A registered electrician must connect the mains. The panel should then be powered up and checked for correct operation.
With the mains turned off and the batteries disconnected, the field wiring is checked and connected to the field terminals on the various cards.
The panel should then be powered up and