Tyco 4100U-S1 installation manual System Power Supply

Models: 4100U-S1

1 138
Download 138 pages 24.63 Kb
Page 25
Image 25

Introduction to 4100U-S1 Cabinet, Continued

The basic 4100U-S1 has a Fuse Distribution Board mounted on the SPS chassis and connected to the Auxiliary Power terminals. This provides four sets of supply terminals, each individually fused at 1A, but the collective capacity is still limited to 2A from the Auxiliary Power supply. The fuses are not directly supervised.

IDNET TERMINAL BLOCK (TB1)

NAC TERMINAL BLOCK (TB2)

IDNET SHIELD JUMPER (P2)

CITY/RELAY CARD TROUBLE INDICATION JUMPER (P3)

DEVICE ADDRESS SWITCH (SW1)

AUXILIARY RELAY TERMINAL BLOCK (TB4)

AUXILIARY POWER TERMINAL BLOCK (TB3)

POWER/COMM TO

NEXT PDI (P6)

POWER/COMM TO CPU MOTHERBOARD (P8)

BATTERY

CONNECTORS:

P4

P5

EARTH

FAULT

MONITOR

JUMPER (P1)

 

 

V N2I4

 

CITY / RELAY CARD

AC

 

 

 

 

CONNECTOR

 

 

 

 

MOUNTING AREA

 

 

 

 

(under board)

 

 

 

 

CITY CARD

- +- + - +- + - + - + - + - +

 

F4

F3

F2

F1

CONNECTOR

 

 

 

FUSE DISTRIBUTION BOARD

(P7)

 

Figure 2-4. System Power Supply

Continued on next page

2-7

Page 25
Image 25
Tyco 4100U-S1 installation manual System Power Supply