![](/images/new-backgrounds/1055642/5564241x1.webp)
11 Start-up check list
Note: See also 29.2 Tube loading.
Ensure that proper connections are achieved between the pump tube and suc- tion and discharge piping.
Ensure proper connection has been made to a suitable power supply.
Ensure that the recommendations in the section on 9 Good pump installation practice are followed.
12 Switching the pump on for the first time
Note: This manual uses bold type to highlight the active option in menu screens: “English” in the first screen represented here. The active option appears on the pump display in inverse text.
Switch on the power supply at the rear of the pump. The pump runs a power- on test to confirm proper functioning of the memory and hardware. If a fault is found, an error message is displayed. See 25.1 Error codes.
The pump displays a language menu. Use the UP and DOWN keys to select your language. Press the ENTER key to confirm your choice.
The information which follows assumes that your choice was English. When the language is chosen this menu will not appear again and all menus will appear in the language you chose. (Language can be reset as described later. See 18.16 Language.)
The pump displays the
The rotation symbol on the display indicates clockwise rotation. The speed of rotation is the pump’s maximum. Other initial
21 |