10 | Top Section | |
| ||
Tools Needed: | Place the top section in the opening | |
Hammer | and vertically align with lower sections. | |
| ||
7/16” Socket | Align vertical marks in the upper | |
alignment sticker, with the lower | ||
| ||
7/16” Wrench | alignment sticker on right hand side on | |
| the back of door. | |
Ratchet Wrench |
| |
7/16” Socket | Temporarily secure the top section by | |
driving a nail in the header near the | ||
Driver | center of the door and bending it over | |
| ||
Power Drill | the top section. | |
| ||
| Now flip up hinge leafs, hold tight | |
| against section, and fasten center | |
| hinges first, and end hinges last. (Refer | |
| to Step 8). | |
| When installing a door with a | |
| TorqueMaster® counterbalance system, | |
| vertical track alignment is critical. | |
| Position flagangle between | |
| (43 mm) to | |
| edge of the door. Tighten the bottom lag | |
| screw. Flagangles must be parallel to |
door width
Alignment stickers
INSTALLATION
the door sections. Repeat for opposite |
side. |
IMPORTANT: The dimension |
between the flagangles must be |
doorwidth plus |
door operation. |
For quick install track: |
Complete the vertical track installation |
by securing the center jamb bracket(s) |
and tightening the other lag screws. |
Repeat for opposite side. |
For fully adjustable track: |
NAIL
top section
vERTICAL tRACK
ROLLER
ROLLER Against
VERTICAL TRACK
fully adjustable track
Complete the vertical track installation |
by securing the center jamb bracket(s) |
and tightening the other lag screws. |
Push the vertical track against the |
rollers so that the rollers are touching |
the deepest part of the curved side of |
the track (see illustration). Tighten all |
the track bolts and nuts. Repeat for |
opposite side. |
top
SECTION
FLAGANGLE
Please Do Not Return This Product To The Store. Contact your local