Operating Instructions and Parts ManualShallow Well Jet Pump

Manual de instrucciones de operación y piezas

Modelos para pozos profundos

Installation

 

Prime

 

4. If necessary, precharge with an air

 

 

 

 

 

(Continued)

 

 

Plug

 

pump to 28 - 30 psi on 1/2, 3/4 and 1

 

 

 

HP pumps.

 

 

Pressure

 

 

 

NOTE: A packer type foot valve can be

 

Air

5. Slope the horizontal pipes upward

Switch

 

installed in the well (Figure 3,

 

 

Volume

toward the pump to prevent

Illustration B). This type of foot valve

 

 

Control

trapping air. If the horizontal

 

 

Tubing

allows the well to be filled with water

 

 

distance exceeds 25 feet, see Chart

 

 

 

when priming and makes the inlet pipe

 

 

 

2 for the recommended pipe size.

much easier to test for leaks. Follow

 

 

 

 

 

the manufacturer’s instructions when

 

 

Air

Electrical

 

installing the packer type foot valve.

 

 

 

As an alternative, an in-line check valve

 

 

Volume

! WARNING

Risk of electrical

Figure 4 - Horizontal Tank

Control

shock. This pump is

can be used with a driven well (Figure

 

designed for indoor installation only.

3, Illustration C). The pipe between the

 

 

 

The voltage of power supply must

check valve and the water level will

 

Air

 

 

 

match the voltage of the pump. All

always be under a vacuum.

 

Volume

 

 

 

above ground well pumps except

Leaking joints or couplings will allow

 

Control

 

 

Air Volume

SWS50BOOST have dual voltage motors

air to leak into the pipe and cause

 

Control

preset at the factory to 230 volts. The

abnormal pump operation. Make sure

 

Tubing

motors can be converted to 115 volts

to use pipe joint compound on all male

Outlet

 

 

by turning the voltage selector to the

pipe threads.

 

 

 

 

desired voltage (See Figure 7). Use a

DUG WELL, CISTERN, LAKE AND SPRING

 

 

 

needle nose pliers to pull the selector

INSTALLATION (FIGURE 12)

 

 

 

out approximately 1/4”, rotate and

1. Install a foot valve on inlet pipe and

 

 

 

then reinsert in correct position.

 

Hose

 

 

 

lower into water.

 

 

 

 

 

Coupling

 

 

 

 

 

 

 

! CAUTION

The foot valve

Figure 5 - Vertical Tank

 

 

 

should be at least

 

 

 

18” from the bottom of the well or

noise transmitted to the house

 

 

sand or sediment could be drawn into

thrugh the piping.

 

230 V

 

the system.

 

4. Provide a hose bib (faucet) at the

 

 

NOTE: When a lake is used as a water

115 V

 

lowest point in the system to drain

 

 

supply, make sure the inlet pipe is deep

 

 

the system for service or storage.

 

 

enough to be submerged at all times.

 

 

 

 

 

 

 

Slope the horizontal piping upward

SHALLOW WELL PUMP WITH

 

 

toward the pump to prevent trapping

 

 

PRECHARGED STORAGE TANK

 

 

air. The pipe must be removed during

 

 

(FIGURE 6)

 

 

230 V

winter months or protected against

 

 

 

 

 

 

 

 

 

 

 

freezing.

 

Motor

Outlet

Priming

 

 

 

 

 

Plug

 

 

Protect the pipe from damage from

 

 

115 V

 

 

 

swimmers and boats.

 

 

Nozzle

Figure 7 - Voltage Selector

 

Install a screen

 

 

 

 

! WARNING

 

 

Clean

Select the proper size wire and fuse

around the inlet

 

 

Out

pipe to prevent the entrapment of

 

 

Drain

(Chart 3). Time delay fuses are

swimmers.

 

 

 

recommended over standard fuses for

SHALLOW WELL PUMP WITH

 

 

Fitting

motor circuit protection. All pump

 

 

 

CONVENTIONAL STORAGE TANK

 

28-30 psi

 

motors have built-in automatic

(FIGURES 4 & 5)

 

 

 

overload protection that will prevent

 

 

3/4 HP & 1 HP

 

1. Install air volume control on tank.

 

 

 

damage to the motor due to

 

 

 

overheating.

 

2. Connect the copper tube from the

 

 

 

 

Figure 6 - Precharged Storage Tank

 

Do not connect to

air volume control to the

! WARNING

uppermost 1/8” NPT opening on the

 

 

 

electric power

1. Shut off the power to the pump.

supply until unit is permanently

side of pump. Be sure the

grounded. Connect ground wire to

connections are tight. Leaking can

2. Open the faucet nearest the tank

approved ground then connect terminal

cause the pump not to prime.

and allow all water to drain from

provided.

 

3. Install a valve and an isolator hose

the tank.

 

A metal underground water pipe or

between the tank and the house

3. Measure the tank precharge at the

well casing at least 10 feet long makes

plumbing to aid in pump removal

valve stem using a tire pressure

the best ground electrode. If plastic

for servicing and for reducing the

gauge.

 

pipe or insulated fittings are used, run

www.waynewatersystems.com

 

 

 

.arcilla o roca

como tales impermeables

materiales entre

atrapada está permeables

 

 

 

 

.irrigación o

tales fines para

Puede .humano

 

 

 

 

 

lavado como

utilizada ser

 

 

.derrumbe se que

evitar para concreto

o piedra ladrillo,

con reviste se Luego

.superficial basante

(2") cm 5,1 y

(1") cm 2,5 entre fluctúan

comunes diámetros Los

.pies) (50 m 15,25 a

menor es general lo por

profundidad La .freática

capa la de debajo

pozos para (6") cm 15,2 doméstico uso de agua de

y (4") cm 10,2 (3"), cm 7,6

(2"), cm 5,1 son comunes

diámetros Los .pies) (1000

m 305 de más hasta pies

algunos entre fluctúan

profundidades Las

.

 

 

 

 

 

 

 

 

 

 

.humano

para apta

El .techos

 

 

 

 

 

consumo

es no agua

Figura 13 - Suministros de Agua

materiales en agua el

cuando Ocurre .tierra la de

emerge que manantial Un

MANANTIAL: (A)

 

 

 

 

(A)

 

 

 

 

 

ESQUISTO

 

 

LAGO, (B) ARROYO, ESTANQUE

MANANTIAL

 

 

 

 

consumo para apta es no

general lo por tratada, sea que

menos a que superficial, Agua

ESTANQUE: o ARROYO LAGO, (B)

 

 

 

 

 

 

 

ACUIFERA

CAPA

TIERRA SUPERFICIAL

PERFORADOPOZO(C)Aguade Suministros

.tuberíasconrevestidoportierra,la en punta profundidad unahasta

maquinariacontierralaconpantallauna con diámetro de piesvarios

enperforadohoyoUntuberíaunaacciona Se de hoyo un excavaSe

PERFORADO:POZO(E)ACCIONADO:POZO (D) EXCAVADO: POZO(C)

 

MATERIAL PERMEABLE

 

ARCILLA

POZO(E)

 

 

 

 

 

 

 

 

 

 

 

 

 

EXCAVADO

 

 

 

 

 

 

 

ARENA

 

 

 

 

 

POZO(D) ACCIONADO

 

losdelluviasdeagua

recolectarparaconstruido

subterráneotanqueUn

CISTERNA:(F)

 

 

FREATICA

 

 

 

 

 

CISTERNA(F)

 

 

 

 

 

 

 

 

 

 

 

 

y

 

 

 

 

 

 

 

 

 

 

 

 

 

29 Sp

4